Tender Details

Particulars Details
Title
Property Development At 5th Floor Of Supreme Court Metro Station (Line 3) Of Delhi Mrts.
Description
Property Development At 5th Floor Of Supreme Court Metro Station (Line 3) Of Delhi Mrts.
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 23600
EMD 56.7 Lakh
Tender Value
Place Delhi
Link

AAAAAAAAAA

Login to view
Start Date May 21, 2025 14:30
End Date

11/06/2025 ( 1 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Design and construction of property development buildings near thirumangalam metro station along the viaduct in open land parcels including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of property development buildings near thirumangalam metro station along the viaduct in open land parcels including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Read more
Design and construction of property development buildings in land parcels at existing mandaveli bus depot and terminus including civil, architectural finishes, plumbing, e and m, hvac, lifts and all associated works

Design and construction of &#x0d property development buildings in land parcels at existing mandaveli bus &#x0d depot and terminus including civil, architectural finishes, plumbing, e and m, &#x0d hvac, lifts and all associated works

Read more
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.

Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.

Read more
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode

Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode

Read more
Design and construction of metro station entry/exit structures integrated with commercial spaces and connecting through link bridge at sholinganallur and thoraipakkam station

Design and construction of metro station entry/exit structures integrated with commercial spaces and connecting through link bridge at sholinganallur and thoraipakkam station

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Armo various electrical and mechanical services at district court, rohini, delhi sh rectification and servicing of ht accessories switchgears in court building sub station

Armo various electrical and mechanical services at district court, rohini, delhi sh rectification and servicing of ht accessories switchgears in court building sub station

Read more
Establishing of 2 x 500 mva, 400/220 kv sub-station at kumher (distt. bharatpur) alongwith 400kv, 1x125 mvar, shunt reactor (bus type) and 4 x80 mvar, shunt reactor (line type) and associated bays on turnkey basis

Establishing of 2 x 500 mva, 400/220 kv sub-station at kumher (distt. bharatpur) alongwith 400kv, 1x125 mvar, shunt reactor (bus type) and 4 x80 mvar, shunt reactor (line type) and associated bays including supply of all equipments/materials, erectio

Read more
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.

Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.

Read more
Construction of 33 kv line, construction of 33/11kv, 1x2.5 mva sub-station and lt line for new industrial estate at no two dhemajibari, dist. biswanath, assam

Construction of 33 kv line construction of 33/11kv 1x2.5 mva sub station and lt line for new industrial estate at no two dhemajibari dist biswanath assam

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise