Tender Details
Particulars | Details |
---|---|
Title |
Conducting Final Location Survey Between Hassan Mangaluru With A New Route Length Of 247 Km And Castlerock Kulem New Double Line (72 Km).
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79342017 |
Reference Number |
FLS-HAS-MAQ-CLR-QLM |
Tender Fee | 0 |
EMD | 12.18 Lakh |
Tender Value | |
Place | Hubli |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79342017/viewNitPdf_4822723.pdf |
Start Date | January 04, 2025 21:02 |
End Date |
29/01/2025 ( Expired 104 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation of 630 sq mm 132 kv sc xlpe underground copper cable (3 phase plus 1 spare) between 220 kv gss sitapura and 132 kv gss, sitapura (route length-approx-1.10 km) including detailed route survey, laying and installation of cable
Installation of 630 sq mm 132 kv sc xlpe underground copper cable (3 phase plus 1 spare) between 220 kv gss sitapura and 132 kv gss, sitapura (route length-approx-1.10 km) including detailed route survey, laying and installation of cable
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreRepair and maintenance of 11 kv overhead line main feeder from dhori main distribution substation to sdocm project sub station including replacement of damaged poles etc. for a route length of 5.0 km approx as required in respect of sdocm of dhori ar
Repair and maintenance of 11 kv overhead line main feeder from dhori main distribution substation to sdocm project sub station including replacement of damaged poles etc. for a route length of 5.0 km approx as required in respect of sdocm of dhori ar
Read moreOther non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad-bengaluru 626 km
Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad-bengaluru 626 km
Read moreConstruction of new 33 kv sub station at gumansinghpura and pungaliya and erection of 33 kv line 0.470 km with 11 kv interconnection 14.40 km for 33 kv gss gumansinghpura and pungaliya under sub division shergarh under district circle jodhpur
Construction of new 33 kv sub station at gumansinghpura and pungaliya and erection of 33 kv line 0.470 km with 11 kv interconnection 14.40 km for 33 kv gss gumansinghpura and pungaliya under sub division shergarh under district circle jodhpur
Read moreConstruction of new 33 kv gss and 33 kv line 18.5 km for utradi jato ki dhani and sajnaniyo ki dhani with 11 kv interconnection 8.1 km for utradi jato ki dhani and sajnaniyo ki dhani under bap sub division phalodi circle
Construction of new 33 kv gss and 33 kv line 18.5 km for utradi jato ki dhani and sajnaniyo ki dhani with 11 kv interconnection 8.1 km for utradi jato ki dhani and sajnaniyo ki dhani under bap sub division phalodi circle
Read moreErection of 11 kv line 4.60 km under ground and 11 kv sub station 1 nos with erection of new pcc poles and dismantile of 11 kv line 1.10 km under ground and 11 kv sub station 1 nos for electrical utility shifting alond saran nagar nallah aen csd a vi
Erection of 11 kv line 4.60 km under ground and 11 kv sub station 1 nos with erection of new pcc poles and dismantile of 11 kv line 1.10 km under ground and 11 kv sub station 1 nos for electrical utility shifting alond saran nagar nallah aen csd a vi
Read moreProviding, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Providing, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Read moreConstruction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l
Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l
Read moreRequest for proposal for the appointment of consultancy agency to conduct a feasibility study for the construction of twin tunnel approx 20 km in length, ing at yerawada and terminating at katraj with various spur and escape route
Request for proposal for the appointment of consultancy agency to conduct a feasibility study for the construction of twin tunnel approx 20 km in length, ing at yerawada and terminating at katraj with various spur and escape route
Read moreof your Industry type