Tender Details

Particulars Details
Title
Conducting Final Location Survey Between Hassan Mangaluru With A New Route Length Of 247 Km And Castlerock Kulem New Double Line (72 Km).
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 79342017
Reference
Number
FLS-HAS-MAQ-CLR-QLM
Tender Fee 0
EMD 12.18 Lakh
Tender Value
Place Hubli
Link https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79342017/viewNitPdf_4822723.pdf
Start Date January 04, 2025 21:02
End Date

29/01/2025 ( Expired 82 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km

Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km

Read more
Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad-bengaluru 626 km

Other non consultancy services aerial lidar survey and other field works for final location survey fls involving for the preparation of dpr for the high speed elevated rail corridor between hyderabad-bengaluru 626 km

Read more
Erection of 11 kv line 4.60 km under ground and 11 kv sub station 1 nos with erection of new pcc poles and dismantile of 11 kv line 1.10 km under ground and 11 kv sub station 1 nos for electrical utility shifting alond saran nagar nallah aen csd a vi

Erection of 11 kv line 4.60 km under ground and 11 kv sub station 1 nos with erection of new pcc poles and dismantile of 11 kv line 1.10 km under ground and 11 kv sub station 1 nos for electrical utility shifting alond saran nagar nallah aen csd a vi

Read more
Construction of new 33 kv gss and 33 kv line 18.5 km for utradi jato ki dhani and sajnaniyo ki dhani with 11 kv interconnection 8.1 km for utradi jato ki dhani and sajnaniyo ki dhani under bap sub division phalodi circle

Construction of new 33 kv gss and 33 kv line 18.5 km for utradi jato ki dhani and sajnaniyo ki dhani with 11 kv interconnection 8.1 km for utradi jato ki dhani and sajnaniyo ki dhani under bap sub division phalodi circle

Read more
Providing, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top

Providing, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top

Read more
Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l

Construction of additional 132 kv s/c line (3 phase and 1 spare) of 1.65 km route length with 400 mm2, xlpe cable from existing laid cable (400 mm2, xlpe cable ) to termination tower location no. 08 along with jointing of cables for completing the l

Read more
Request for proposal for the appointment of consultancy agency to conduct a feasibility study for the construction of twin tunnel approx 20 km in length, ing at yerawada and terminating at katraj with various spur and escape route

Request for proposal for the appointment of consultancy agency to conduct a feasibility study for the construction of twin tunnel approx 20 km in length, ing at yerawada and terminating at katraj with various spur and escape route

Read more
Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2

Construction of road of 4m wide between metro median and existing nhai main carriageway along hosur main road between bommasandra and central silk board in stretches between metro piers,rp616 to rp207 for a length of 5.244 km of r5 line of bmrcl,ph-2

Read more
Providing of alternate source to 33/11kv nandanavanam ss by erection of new 33kv feeder from 220/132/33kv autonagar eht ss by stringing of 33kv line for a distance of 3.83km and laying of 33kv xlpe ug cable double for a distance of 0.480 km from 220/132/33kv autonagar eht ss to 33/11kv nandanavanam ss in meerpet section of champapet division in saroornagar circle

Providing of alternate source to 33/11kv nandanavanam ss by erection of new 33kv feeder from 220/132/33kv autonagar eht ss by stringing of 33kv scoh line for a distance of 3.83 km and laying of 33kv 3x400sq.mm xlpe ug cable double run for a distance of 0.480km from 220/132/33kv autonagar eht ss to 33/11kv nandanavanam ss in meerpet section of champapet sub division of champapet division in saroornagar circle

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise