Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of Cable Mounting With Replacement Of Ht Kit With Repairing Of Gi Structure And Fresh Coat Of Paint On Gi Structure In Dam Colony Substation And 15 No. Colony Substation Jocp Under Hazaribagh Area.
|
| Description |
Repairing Of Cable Mounting With Replacement Of Ht Kit With Repairing Of Gi Structure And Fresh Coat Of Paint On Gi Structure In Dam Colony Substation And 15 No. Colony Substation Jocp Under Hazaribagh Area.
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_323792_1 |
|
Reference Number |
PO/JOCP/EnM/Tender/24-25/23 |
| Tender Fee | 0 |
| EMD | 3500 |
| Tender Value | - |
| Place | JOCP |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=335631 |
| Start Date | December 21, 2024 16:30 |
| End Date |
Expired
31/12/2024
Expired 653 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months alongwith the renovation of lightning protection system of main substation, laiyo substation and mines at
Annual maintenance of different 11 kv ht incoming and differernt 3.3 kv ht outgoing overhead power lines of jocp for a period of 12 months along with the renovation of lightning protection system of main substation, laiyo substation and mines at
Read moreRe-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.
Re-arrangement of bus bar structure, proper gravelling work of main substation for kugp and amc works of 11kv/3.3kv/550v/440v oh lines under kedla ugp, hazaribagh area.
Read moreShifting of 630kva, 11 0.4kv 250kva, 11 0.4kv transformer structure along with 11kv ht line, 3 phase lt line for proper execution of newly construction of 2x3.15mva substation at nerchowk in e section nerchowk under esd, hpseb ltd, nerchowk, distt.
Shifting of 630kva, 11 0.4kv 250kva, 11 0.4kv transformer structure along with 11kv ht line, 3 phase lt line for proper execution of newly construction of 2x3.15mva substation at nerchowk in e section nerchowk under esd, hpseb ltd, nerchowk
Read moreSolar osram led chip luminary 36 watt,inbuilt life po4 12 point 8v30ah,exide mono module 125 wp,6 mtr gi tubular pole buried type,module mounting structure,luminary arm,2point5 sq mm copper cabl 2 point 5 mtr each,fitting fixture and accessories,foundation anchoring and civil consumables,installation erection and commissioning
Solar osram led chip luminary 36 watt,inbuilt life po4 12 point 8v30ah,exide mono module 125 wp,6 mtr gi tubular pole buried type,module mounting structure,luminary arm,2point5 sq mm copper cabl 2 point 5 mtr each,fitting fixture and accessories,foundation anchoring and civil consumables,installation erection and commissioning
Read moreSupply of structure bonds (other than platform) fabricated from ms flat steel of size 40x6 mm with smooth edges, length 3.5 metres and above, complete with gi nuts, bolts and washers of size 16x50x38 mm, duly painted with one coat of red oxide primer and finished with black paint, as per rdso drawing no. eti/ohe/p/7000 mod-f or latest
Supply of structure bonds (other than platform) fabricated from ms flat steel of size 40x6 mm with smooth edges, length 3.5 metres and above, complete with gi nuts, bolts and washers of size 16x50x38 mm, duly painted with one coat of red oxide primer and finished with black paint, as per rdso drawing no. eti/ohe/p/7000 mod-f or latest
Read moreSupply and installation new chemical earthing with chamber pit and hardware,supply and installation new copper plate earthing with chamber pit for colony and hardware,earthing treatment for the solar plant with hardware,11 kv pole painting including cross arms and structures,33 kv pole painting including cross arms and structures,painting 33 kv substation with all equipment instrument transformers supports etc,lightning arrester copper supply with earthing installation for colony,gi flat 25 3 mm supply with installation,installation of lv ms cable tray channel with stand on lv side of transformers at solar plant,transformers painting of solar plant,ht cable termination kit joint charges,supply of 33 kv 3 core 185 sqmm cable kit outdoor termination,supply of 33 kv 3 core 185 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit outdoor termination,a supply of 11 kv 3 core 70 sqmm ug cable kit outdoor termination,b supply of 11 k
Supply and installation new chemical earthing with chamber pit and hardware,supply and installation new copper plate earthing with chamber pit for colony and hardware,earthing treatment for the solar plant with hardware,11 kv pole painting including cross arms and structures,33 kv pole painting including cross arms and structures,painting 33 kv substation with all equipment instrument transformers supports etc,lightning arrester copper supply with earthing installation for colony,gi flat 25 3 mm supply with installation,installation of lv ms cable tray channel with stand on lv side of transformers at solar plant,transformers painting of solar plant,ht cable termination kit joint charges,supply of 33 kv 3 core 185 sqmm cable kit outdoor termination,supply of 33 kv 3 core 185 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit indoor termination,supply of 33 kv 3 core 400 sqmm cable kit outdoor termination,a supply of 11 kv 3 core 70 sqmm ug cable kit outdoor termination,b supply of 11 k
Read moreRepair of dam colony road under jocp, hazaribagh area
Repair of dam colony road under jocp, hazaribagh area
Read moreComplete repairing and rewinding of 180kw 3.3kv ht motor of jocp under hazaribagh area
Complete repairing and rewinding of 180kw 3.3kv ht motor of jocp under hazaribagh area
Read moreFresh electrical wiring of central substation building, basantpur under hazaribagh area
Fresh electrical wiring of central substation building, basantpur under hazaribagh area
Read moreProviding 11 kv, 3 core, 50 sq.mm ht ug cable from four pole structure near 33 kv substation gg dam to dp structure of gg dam,tirumala
Providing 11 kv, 3 core, 50 sq.mm ht ug cable from four pole structure near 33 kv substation gg dam to dp structure of gg dam,tirumala
Read moreof your Industry type