Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Accumulated Earth From The Moat Of Lion Enclosure At Jambu Zoo
|
| Description |
Removal Of Accumulated Earth From The Moat Of Lion Enclosure At Jambu Zoo
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_FD_231825_1 |
|
Reference Number |
35 WLWJZ of 2023-24 |
| Tender Fee | 1000 |
| EMD | 5620 |
| Tender Value | - |
| Place | Regional Wildlife Warden |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | October 03, 2023 21:15 |
| End Date |
Expired
10/10/2023
Expired 1101 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providng and fixing of crash barrier at jambu zoo
Providng and fixing of crash barrier at jambu zoo
Read moreSitc of cold room enclosure,sitc of cold room evaporator and condensing unit,temperature controller and allied works,sitc of extra piping,removal of existing old cold room enclosure
Sitc of cold room enclosure,sitc of cold room evaporator and condensing unit,temperature controller and allied works,sitc of extra piping,removal of existing old cold room enclosure
Read moreFlood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near shree devi temple shiroli keri in poriem constituency
Flood mitigation works of cleaning and debris removal of blockages and accumulated silt from valvanti river near shree devi temple shiroli keri in poriem constituency
Read moreRemoval of earth to restore the capacitiy of narasinganallur tank in narasinganallur village of tirunelveli taluk in tirunelveli district
Removal of earth to restore the capacitiy of narasinganallur tank in narasinganallur village of tirunelveli taluk in tirunelveli district
Read moreAnnual plan-pkda bp s0142/27 construction of side protection wall after earth removal near canteen-pampakuda bpgeneral civil work
Annual plan-pkda bp s0142/27 construction of side protection wall after earth removal near canteen-pampakuda bpgeneral civil work
Read moreMtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Mtps i mill plant unit ii removal of accumulated ash from the horizontal portions of the mill inlet pa hot air duct at 4 5 mtr 18 mtr level for mills 2a to 2f during annual overhaul 2026 27
Read moreTtpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Ttpsmechii bm unit iii removal of ash accumulated over the mechanical dust collector path a b c d and id fan a b suction side ducts and welding the eroded weld joints in the mechanical dust collector path a b c d and suction side duct of id fan ab
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreDisconnecting and earthing device, 8 pole, 2 way, no-off on load, 63a 750v ac (1000v insulation), 2no + 2nc with heavy handle and pad locking arrangement. in earth position, mounted in a stainless steel enclosure suitable for ac 23 duty conforming to is 13947/iec 947, to drawing no. m137, 0827407 of m/s schaltbau or catalogue no. 73342slb321 ogb of m/s l&t as per spec.no. edts 355 rev.1 amdt as per drg.no. n/a specn: is/iec 60947-3 (1999)
Disconnecting and earthing device, 8 pole, 2 way, no-off on load, 63a 750v ac (1000v insulation), 2no + 2nc with heavy handle and pad locking arrangement. in earth position, mounted in a stainless steel enclosure suitable for ac 23 duty conforming to is 13947/iec 947, to drawing no. m137, 0827407 of m/s schaltbau or catalogue no. 73342slb321 ogb of m/s l&t as per spec.no. edts 355 rev.1 amdt as per drg.no. n/a specn: is/iec 60947-3 (1999)
Read moreof your Industry type