Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Overhauling Of Lime Mud Screw Conveyors At Tnpl Unit Ii
|
| Description |
Overhauling Of Lime Mud Screw Conveyors At Tnpl Unit Ii, Trichy.
|
| Organisation | Tamilnadu Newsprint and Papers Limited | State Govt. and UT |
| Tender Id | 2025_TNPL_520376_1 |
|
Reference Number |
TNPL/TOS/U2/242523003671 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | TNPL UNIT - II, MONDIPATTI |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=619240 |
| Start Date | January 25, 2025 00:00 |
| End Date |
Expired
07/02/2025
Expired 611 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Procurement of epfr conveyor belts for belt conveyors working in coal handling plant at stpp, jaipur, mancherial, telangana
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read morePeriodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Periodical cleaning of mud accumulated at washing platforms and etps at base workshop and chp for the year 2026-27 at ocp-i, rg-iii area.
Read moreSupply and delivery of bleaching powder lime powder safety jacket brooms phenyl etc of sanitation related material on the ganesh nimajjanam in bodhan town under mgf
Supply and delivery of bleaching powder lime powder safety jacket brooms phenyl etc of sanitation related material on the ganesh nimajjanam in bodhan town under mgf
Read moreProcurement of led light fittings and led screw type bulbs for use at vkp mine, rg2.
Procurement of led light fittings and led screw type bulbs for use at vkp mine, rg2.
Read moreSupply of screw conveyor assemblies for ball tube mills bbd 4772 in unit-9 and 10
Supply of screw conveyor assemblies for ball tube mills bbd 4772 in unit-9 and 10
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreSupply and delivery of bleaching powder for cleaning the eslrs and mini water tanks and supply and delivery of lime powder in dubbak municipality under general fund/15th fc/any other grants
Supply and delivery of bleaching powder for cleaning the eslrs and mini water tanks and supply and delivery of lime powder in dubbak municipality under general fund/15th fc/any other grants
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreof your Industry type