Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Ttps Operation Circle Cad Foph Overhauling And Load Testing Of 3 Ton Capacity Eot Crane East And West Available At Fuel Oil Pump House Ii
|
Description |
Ttps Operation Circle Cad Foph Overhauling And Load Testing Of 3 Ton Capacity Eot Crane East And West Available At Fuel Oil Pump House Ii
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_557970_1 |
Reference Number |
CE/SE/O/TTPS/Spec.No.110/25-26 |
Tender Fee | 0 |
EMD | 1700 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=666398 |
Start Date | May 14, 2025 22:30 |
End Date |
28/05/2025 ( Expired 34 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Ttps es circle em iii load testing of 2 nos 15 tonne capacity wire rope electric hoists at id fan 4a and 4b and 5a and 5b of unit iv and v boiler area
Read moreTtps operation circle oe ii erection of 150 mtrs 200 nb ms erw pipe lines for fire protection mulsifyre line from clarified water pump house to service building
Ttps operation circle oe ii erection of 150 mtrs 200 nb ms erw pipe lines for fire protection mulsifyre line from clarified water pump house to service building
Read moreTtps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii
Ttps operation circle cad acwph reconditioning of 450 nb gate valves of acw pump unit i, ii and iii
Read moreTtps operation circle cad electrical sub division ii overhauling of 1 no. 6.6 kv, 570 kw jyoti make cooling water pump motor m9 sl.no.132304 at cwph ii
Ttps operation circle cad electrical sub division ii overhauling of 1 no. 6.6 kv, 570 kw jyoti make cooling water pump motor m9 sl.no.132304 at cwph ii
Read moreTtps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Ttps operation circle cad acwph i inspection, checking of supply and pipe lines of bearing cooling water, arresting leakages and assisting the shift engineer in all activities at auxiliary cooling water pump house i by recording the paramete
Read moreTtps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Ttps operation circle cad reconditioning of 1600mm dia butterfly valves in condenser cooling water inlet and outlet pipe lines in east side and west side of unit iv and v
Read moreSupply, erection, testing and commissioning of complete door assemblies, panel and ropes for unit-ii boiler rhs lift capacity of 3 ton
Supply, erection, testing and commissioning of complete door assemblies, panel and ropes for unit-ii boiler rhs lift capacity of 3 ton
Read moreTtps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Ttps operation circle cad acwph unit i, ii iii annual overhauling cleaning and painting of cooling tower pipes in acw system
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreof your Industry type