Tender Details
About Tender
🏗️ Construction Opportunity At Tuticorin Airport 🛫🏗️ The Airports Authority Of India (Aai), As A Public Sector Undertaking, Is Calling For Bids From Experienced Contractors For The Construction Of An Entrance Portal, Precast Boundary Walls, And The Laying Of Ofc Cables For The Cns Facility At Tuticorin Airport. 📅 Bid Submission Deadline: April 24, 2024, 16:30 Pm Tender Fee: Inr 1180 Emd: Inr 741800 Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Cost Estimates, And A Timeline For Project Completion. The Project Will Involve The Construction Of An Entrance Portal At The Approach Road To The Nhai Junction, The Installation Of A Precast Boundary Wall On Both Sides Of The Approach Road, And The Provision Of Ducts For Ofc Cables For The Cns Facility. Keywords: Construction, Aai, Tuticorin Airport, Entrance Portal, Precast Boundary Wall, Ofc Cable, Cns Facility, Government Tender, Public Sector UndertakingParticulars | Details |
---|---|
Title |
Construction Of Entrance Portal In The Approach Road To Nhai Junction At Both Sides, Precast Boundary Wall On Both Sides Of Approach Road And Provision Of Hume Pipe Laying For Ofc Cable For Cns Facility At Tuticorin Airport
|
Description |
Construction Of Entrance Portal In The Approach Road To Nhai Junction At Both Sides, Precast Boundary Wall On Both Sides Of Approach Road And Provision Of Hume Pipe Laying For Ofc Cable For Cns Facility At Tuticorin Airport
|
Organisation | Airports Authority of India | Public Sector Undertakings |
Tender Id | 2024_AAI_192346_1 |
Reference Number |
AAI/TUT/ENGG(C)/W1/23-24 |
Tender Fee | 1180 |
EMD | 7.42 Lakh |
Tender Value | |
Place | TUTICORIN AIRPORT |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=210684 |
Start Date | March 26, 2024 22:00 |
End Date |
24/04/2024 ( Expired 395 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Additional work for laying of extension or laying of paralla pipe line ,sinking of tube well 3rd construction of boundary wall,pump house ,internnal road restoration work inter connection of tw with allied work for silut pwss aushgram-i block
Additional work for laying of extension or laying of paralla pipe line ,sinking of tube well 3rd construction of boundary wall,pump house ,internnal road restoration work inter connection of tw with allied work for silut pwss aushgram-i block
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreConstruction of rain water collection sump, injection borewell for ground water recharge, laying of 900mm and 600mm dia rcc nhp4 storm water pipe line, laying of precast concrete blocks, construction of compound wall with see through railing and gates at hmda grounds, ntr marg
Construction of rain water collection sump, injection borewell for ground water recharge, laying of 900mm and 600mm dia r.c.c np4 storm water pipe line, laying of precast concrete blocks, construction of compound wall with see through railing and gates at hmda grounds, ntr marg
Read more11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
11 kv cable laying works for new cta sub-station power connection, providing hume pipe and 11 kv cable laying near lions club, digboi and shifting of 11 kv cable from nazirating switch board to township switch board at tinali sub-station for aod.
Read morePlantation of trees on both sides of the road at sub division sudhagad pali ,district raigad under division alibag along with maintenance and repair for 3 years
Plantation of trees on both sides of the road at sub division sudhagad pali ,district raigad under division alibag along with maintenance and repair for 3 years
Read morePlantation of trees on both sides of the road at sub division sudhagad pali ,district raigad under division alibag along with maintenance and repair for 3 years
Plantation of trees on both sides of the road at sub division sudhagad pali ,district raigad under division alibag along with maintenance and repair for 3 years
Read moreConstruction of boundary wall, guard room, land development, approach road and masonry drain for the proposed over head reservoir site at zone-iv, suranankar within panskura municipality under amrut 2.0
Construction of boundary wall, guard room, land development, approach road and masonry drain for the proposed over head reservoir site at zone-iv, suranankar within panskura municipality under amrut 2.0
Read moreRepair of damages due to laying of mdpe natural gas pipe line on link road from dehlan to basdehra upto punjab boundary km.0.0 to 2.400 (sh p.l interlocking cement concrete paver blocks at rd.1.758 to 1.893(under ofc deposit)
Repair of damages due to laying of mdpe natural gas pipe line on link road from dehlan to basdehra upto punjab boundary km.0.0 to 2.400 (sh p.l interlocking cement concrete paver blocks at rd.1.758 to 1.893(under ofc deposit)
Read moreFor rewinding of 20 hp pump supply and laying of ms pipe flange power cable for submersible pump installed at 220 kv substation rewa road prayagraj under etd-ii prayagraj
For rewinding of 20 hp pump supply and laying of ms pipe flange power cable for submersible pump installed at 220 kv substation rewa road prayagraj under etd-ii prayagraj
Read moreConstruction of brick wall around both sides of lift entrance on fobs at munirka, ullan batter marg, rtr marg, outer ring road moti lal nehru camp, dwarka approach road under pwd division south west road-i under sub division-i new delhi.
Construction of brick wall around both sides of lift entrance on fobs at munirka, ullan batter marg, rtr marg, outer ring road moti lal nehru camp, dwarka approach road under pwd division south west road-i under sub division-i new delhi.
Read moreof your Industry type