Tender Details
Particulars | Details |
---|---|
Title |
Repairing Replacement Of Damaged V Bar Grid Of Cooling Tower And Spray Nozzle Of U 4 Ndct During Unit 4 Overhauling Period 24
|
Description |
Repairing Replacement Of Damaged V Bar Grid Of Cooling Tower And Spray Nozzle Of U 4 Ndct During Unit 4 Overhauling Period 24
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id | 2024_WBPDC_718610_1 |
Reference Number |
WBPDCL/SGTPP/NIT/E3004/24-25 |
Tender Fee | 0 |
EMD | 1.04 Lakh |
Tender Value | |
Place | Sagardighi Thermal Power Plant Monigram |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1581343 |
Start Date | July 22, 2024 15:30 |
End Date |
14/08/2024 ( Expired 252 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing and painting of hydroveyor structure during overhauling of unit-4 at ktps
Repairing and painting of hydroveyor structure during overhauling of unit-4 at ktps
Read moreOverhauling of 6.6 kv ht motors of u-4, u-2 and u-1, bktpp during respective unit overhauling
Overhauling of 6.6 kv ht motors of u-4, u-2 and u-1, bktpp during respective unit overhauling
Read moreSupply of pvc v-bar, drift eliminator blade, nozzles, grp grid and associated items of induced draft, cross flow cooling tower, 4x250mw, stage-i, phase-ii, ctpp, rvunl, chhabra
Supply of pvc v-bar, drift eliminator blade, nozzles, grp grid and associated items of induced draft, cross flow cooling tower, 4x250mw, stage-i, phase-ii, ctpp, rvunl, chhabra
Read moreAnnual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra
Read moreEmandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.
Read morePartial repairing / replacement of damaged bushing with stud and cork gasket etc. of 4 nos. transformers of pragati nagar colony and rehab sites under dipka area.
Partial repairing / replacement of damaged bushing with stud and cork gasket etc. of 4 nos. transformers of pragati nagar colony and rehab sites under dipka area.
Read moreOverhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw
Overhauling of flue gas damper assembly of aph &#x0d inlet/primary/secondary air, servicing of esp inlet &#x0d gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the &#x0d capital overhauling of unit6 of 2x250mw
Read moreRepair and replacement of compressor oil, descalling of chilling unit, chillar water pump, condensor pump, butterfly valve and service of expansion valve and service and cooling tower water , at haryana raj bhawan, sector 6, chandigarh ch to 221
Repair and replacement of compressor oil, descalling of chilling unit, chillar water pump, condensor pump, butterfly valve and service of expansion valve and service and cooling tower water , at haryana raj bhawan, sector 6, chandigarh ch to 221
Read morePainting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025
Painting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025
Read moreThermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.
Thermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.
Read moreof your Industry type