Tender Details

Particulars Details
Title
Repairing Replacement Of Damaged V Bar Grid Of Cooling Tower And Spray Nozzle Of U 4 Ndct During Unit 4 Overhauling Period 24
Description
Repairing Replacement Of Damaged V Bar Grid Of Cooling Tower And Spray Nozzle Of U 4 Ndct During Unit 4 Overhauling Period 24
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2024_WBPDC_718610_1
Reference
Number
WBPDCL/SGTPP/NIT/E3004/24-25
Tender Fee 0
EMD 1.04 Lakh
Tender Value
Place Sagardighi Thermal Power Plant Monigram
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1581343
Start Date July 22, 2024 15:30
End Date

14/08/2024 ( Expired 252 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing and painting of hydroveyor structure during overhauling of unit-4 at ktps

Repairing and painting of hydroveyor structure during overhauling of unit-4 at ktps

Read more
Overhauling of 6.6 kv ht motors of u-4, u-2 and u-1, bktpp during respective unit overhauling

Overhauling of 6.6 kv ht motors of u-4, u-2 and u-1, bktpp during respective unit overhauling

Read more
Supply of pvc v-bar, drift eliminator blade, nozzles, grp grid and associated items of induced draft, cross flow cooling tower, 4x250mw, stage-i, phase-ii, ctpp, rvunl, chhabra

Supply of pvc v-bar, drift eliminator blade, nozzles, grp grid and associated items of induced draft, cross flow cooling tower, 4x250mw, stage-i, phase-ii, ctpp, rvunl, chhabra

Read more
Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra

Annual contract for providing cup lock metallic scaffolding in side and outside the boiler during annual overhauling of unit 1 to 4, ctpp, rvunl, chhabra

Read more
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.

Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.

Read more
Partial repairing / replacement of damaged bushing with stud and cork gasket etc. of 4 nos. transformers of pragati nagar colony and rehab sites under dipka area.

Partial repairing / replacement of damaged bushing with stud and cork gasket etc. of 4 nos. transformers of pragati nagar colony and rehab sites under dipka area.

Read more
Overhauling of flue gas damper assembly of aph inlet/primary air/secondary air, servicing of esp inlet gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the capital overhauling of unit6 of 2x250mw

Overhauling of flue gas damper assembly of aph &amp#x0d inlet/primary/secondary air, servicing of esp inlet &amp#x0d gate, reclamation/repairing of worn-out coal nozzle, replacement/repairing of bends in boiler during the &amp#x0d capital overhauling of unit6 of 2x250mw

Read more
Repair and replacement of compressor oil, descalling of chilling unit, chillar water pump, condensor pump, butterfly valve and service of expansion valve and service and cooling tower water , at haryana raj bhawan, sector 6, chandigarh ch to 221

Repair and replacement of compressor oil, descalling of chilling unit, chillar water pump, condensor pump, butterfly valve and service of expansion valve and service and cooling tower water , at haryana raj bhawan, sector 6, chandigarh ch to 221

Read more
Painting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025

Painting work of bottom ash hopper area fae tower area and other miscellaneous areas of ahp stg 1 during unit 1 overhauling scheduled in aug sept2025

Read more
Thermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.

Thermal insulation in different areas of boiler and auxiliaries, esp, ducting, ms line, crh line, hrh line and id fan area of unit 7 or 8, dpps during overhauling period.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise