Tender Details

Particulars Details
Title
Repairing Of Tiles Terracing Of Design Building, Dlcsupva, Rohtak (At The Risk And Cost Of Sh. Kuldeep Sharma Contractor, Rohtak)
Description
Repairing Of Tiles Terracing Of Design Building, Dlcsupva, Rohtak (At The Risk And Cost Of Sh. Kuldeep Sharma Contractor, Rohtak)
Organisation Haryana Government | State Govt. and UT
Tender Id 2026_HRY_496023_1
Reference
Number
2026/TileTerracing1stCall
Tender Fee 2000
EMD 2006
Tender Value -
Place DLCSUPVA
Link
View Original Tender Notice

https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=574532

Start Date January 10, 2026 14:30
End Date
Expired 24/01/2026

Expired 267 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair and maintenance work of road from peepalda to rajpura at the risk and cost of the contractor.

Repair and maintenance work of road from peepalda to rajpura at the risk and cost of the contractor.

Read more
Repair and maintenance work of road from mega highway to gadarwara noorji km 0/00 to 4/00 at the risk and cost of the contractor.

Repair and maintenance work of road from mega highway to gadarwara noorji km 0/00 to 4/00 at the risk and cost of the contractor.

Read more
Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor

Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor

Read more
Execution of operation and maintenance works on selected stretches of puintola tangi of nh 16 including construction of drains and slabs at location delinked from scope of epc contractor at the risk n cost of epc contractor 2nd call

Execution of operation and maintenance works on selected stretches of puintola tangi of nh 16 including construction of drains and slabs at location delinked from scope of epc contractor at the risk n cost of epc contractor 2nd call

Read more
Overlay with sma from village bhamaiya ch.780.920 to village baletia 803.420 (design ch. 328.500 to ch. 351.000) section of dve (nh-148n) in the state of gujarat (package-29) at risk and cost of contractor on single percentage item rate basis

Overlay with sma from village bhamaiya ch.780.920 to village baletia 803.420 (design ch. 328.500 to ch. 351.000) section of dve (nh-148n) in the state of gujarat (package-29) at risk and cost of contractor on single percentage item rate basis

Read more
Overlay with sma from baletia of panchmahal ch. 803.420 to village pratap nagar of vadodara 824.920 (design ch. 351.000 to ch. 372.500) section of dve (nh-148n) in the state of gujarat (package-30) at risk and cost of contractor on single percentage

Overlay with sma from baletia of panchmahal ch. 803.420 to village pratap nagar of vadodara 824.920 (design ch. 351.000 to ch. 372.500) section of dve (nh-148n) in the state of gujarat (package-30) at risk and cost of contractor on single percentage

Read more
Request for pre-qualification of bidders (rfq) - 2026 for implementing maintenance works to be taken up on risk and cost of the concessionaire/contractor under the jurisdiction of ro-guwahati.

Request for pre-qualification of bidders (rfq) - 2026 for implementing maintenance works to be taken up on risk and cost of the concessionaire/contractor under the jurisdiction of ro-guwahati.

Read more
Rectification and filling of potholes at 47 locations in duburi chandikhikhole section of nh 53 at the risk n cost of the epc contractor in the state of odisha 2nd call

Rectification and filling of potholes at 47 locations in duburi chandikhikhole section of nh 53 at the risk n cost of the epc contractor in the state of odisha 2nd call

Read more
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Read more
Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor

Execution of balance work and maintenance work of the itarsi- betul section of nh-46 from ch. 63.00 to km 137.000 except tiger corridor section at the risk and cost of contractor

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise