Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Handling And Transport On Lumpsum Basis Free Text Book Loading And Unloading With Transportation
|
| Description |
|
| Organisation | Basic Education Department Uttar Pradesh | |
| Tender Id | GEM/2025/B/6031831 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | March 07, 2025 01:38 |
| End Date |
Expired
17/03/2025
Expired 574 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | A K ENTERPRISES | 17-03-2025 12:03:48 | Offline upload | N/A | Qualified |
| 2 | BHANUMATI ENTERPRISES | 17-03-2025 11:36:19 | Offline upload | N/A | Qualified |
| 3 | M/S- PRECISION ENGINEERING WORK | 17-03-2025 11:30:41 | Registered with designated Agency / Authority | MSE | Disqualified |
| 4 | ravindraenterprises & suplier | 17-03-2025 11:53:15 | Offline upload | N/A | Qualified |
| 5 | TANVI ENTERPRISES | 17-03-2025 11:45:49 | Offline upload | N/A | Qualified |
Tender for road transportation of bulk petroleum products by top loading tank trucks- ms/ hsd/ branded fuels vashi terminal
Tender for road transportation of bulk petroleum products by top loading tank trucks- ms/ hsd/ branded fuels vashi terminal
Read moreFor hiring of outsource vehicle 01 no. 8/9 mt or equivalent including loading and unloading by 4 no unskilled workers for grid const.sub division,pstcl., jalandhar.
For hiring of outsource vehicle 01 no. 8/9 mt or equivalent including loading and unloading by 4 no unskilled workers for grid const. sub division, pstcl., jalandhar.
Read moreNotice inviting tender for selection and empanelment of transportation - cum- handling contractors for main transportaion of food grains.
Notice inviting tender for selection and empanelment of transportation - cum- handling contractors for main transportaion of food grains.
Read moreFor dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
For dismantling of ocp substation shed of size 50 ft x 50 and dismantling shifting, loading unloading of 1.5mva,6.6kv/3.3kv, transformer of badeopur colliery under sijua area
Read moreDismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Dismantling, loading, unloading and erection of rc pump piping and fitting items of stage-i absorber of 3x 200mw 3 x 500mw, stage-i ii, ntpc ramagundam-fgd site
Read moreFor dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area
For dismantling and manual transporting and stocking of ms pipe 10 inch 800 mtrs. and old ms pontoon dismantling and transporting loading and unloading at basdeopur colliery under sijua area
Read moreFly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Fly wheel for transport air compressors model: 1hb4bisnt (kg khosla make) for dry ash handling plant of ktps-v stage
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type