Tender Details

Particulars Details
Title
Replacement Of Ms Discharge Line Duct Of Cold Air Blower With Ss 316 L And Fabrication Of End Dummy And Flange For Scrubber Ventury Bottom Portion.
Description
Replacement Of Ms Discharge Line Duct Of Cold Air Blower With Ss 316 L And Fabrication Of End Dummy And Flange For Scrubber Ventury Bottom Portion.
Organisation The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department
Tender Id 2025_FACT_846998_1
Reference
Number
3012/2024-2025/E30900
Tender Fee 0
EMD 5000
Tender Value
Place Udyogamandal
Link https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=890364
Start Date January 31, 2025 19:30
End Date

15/02/2025 ( Expired 92 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of ms cast basalt line pipes having one end plain and other end having flange

Procurement of ms cast basalt line pipes having one end plain and other end having flange

Read more
Notice inviting quotation for fabrication of fire hydrant discharge head, installation of submersible pump, fire hydrant line inspection / servicing / fabrication of hydrant points and painting of fire hydrant line

Notice inviting quotation for fabrication of fire hydrant discharge head, installation of submersible pump, fire hydrant line inspection / servicing / fabrication of hydrant points and painting of fire hydrant line

Read more
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps

Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps

Read more
Supply, fabrication and installation of ms and ss ladder and platforms for operation of dampers at awtsf, swmf, nrb, barc, tarapur.

Supply, fabrication and installation of ms and ss ladder and platforms for operation of dampers at awtsf, swmf, nrb, barc, tarapur.

Read more
Labour contract for replacement of vapour line from evaporator 5th body (5mtrs) and renewal of sulphur burner-3 cool scrubber renewal works

Labour contract for replacement of vapour line from evaporator 5th body (5mtrs) and renewal of sulphur burner-3 cool scrubber renewal works

Read more
Construction of outside ramp with ss railing and ei works inside the lab as balance work for establishment of modern laboratory with high end lab equipment at centre for laboratory animal research and training, (clart) buddhapark, kalyani, nadia-7412

Construction of outside ramp with ss railing and ei works inside the lab as balance work for establishment of modern laboratory with high end lab equipment at centre for laboratory animal research and training, (clart) buddhapark, kalyani, nadia-7412

Read more
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.

Read more
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site

Read more
Denting fabrication of operators cabin cabin door along with replacement of panes 2 numbers all sides hand rail platform and ladder replacement both sides broken rear view mirror and fabrication of dumper dala rear side also overhauling of air

Denting fabrication of operators cabin cabin door along with replacement of panes 2 numbers all sides hand rail platform and ladder replacement both sides broken rear view mirror and fabrication of dumper dala rear side also overhauling of air

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise