Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Ms Discharge Line Duct Of Cold Air Blower With Ss 316 L And Fabrication Of End Dummy And Flange For Scrubber Ventury Bottom Portion.
|
Description |
Replacement Of Ms Discharge Line Duct Of Cold Air Blower With Ss 316 L And Fabrication Of End Dummy And Flange For Scrubber Ventury Bottom Portion.
|
Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
Tender Id | 2025_FACT_846998_1 |
Reference Number |
3012/2024-2025/E30900 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Udyogamandal |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=890364 |
Start Date | January 31, 2025 19:30 |
End Date |
15/02/2025 ( Expired 92 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of ms cast basalt line pipes having one end plain and other end having flange
Procurement of ms cast basalt line pipes having one end plain and other end having flange
Read moreNotice inviting quotation for fabrication of fire hydrant discharge head, installation of submersible pump, fire hydrant line inspection / servicing / fabrication of hydrant points and painting of fire hydrant line
Notice inviting quotation for fabrication of fire hydrant discharge head, installation of submersible pump, fire hydrant line inspection / servicing / fabrication of hydrant points and painting of fire hydrant line
Read moreMtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Mtps i mill plant ac plant unit i aoh 2025 26 air washer system epoxy painting of blowers discharge duct spray system replacement of damaged duct area and renewal of bellows w type eliminator chemical cleaning overhauling the awcw pumps
Read moreSupply, fabrication and installation of ms and ss ladder and platforms for operation of dampers at awtsf, swmf, nrb, barc, tarapur.
Supply, fabrication and installation of ms and ss ladder and platforms for operation of dampers at awtsf, swmf, nrb, barc, tarapur.
Read moreLabour contract for replacement of vapour line from evaporator 5th body (5mtrs) and renewal of sulphur burner-3 cool scrubber renewal works
Labour contract for replacement of vapour line from evaporator 5th body (5mtrs) and renewal of sulphur burner-3 cool scrubber renewal works
Read moreConstruction of outside ramp with ss railing and ei works inside the lab as balance work for establishment of modern laboratory with high end lab equipment at centre for laboratory animal research and training, (clart) buddhapark, kalyani, nadia-7412
Construction of outside ramp with ss railing and ei works inside the lab as balance work for establishment of modern laboratory with high end lab equipment at centre for laboratory animal research and training, (clart) buddhapark, kalyani, nadia-7412
Read moreKtps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Ktps-v-cam-laying of fire crete cement to the bottom ash hoppers, fabrication and replacement of refractory cooling water headers and laying of 200nb ci pipes of bottom ash handling system for unit-9 during the overhaul 2025-2026-reg.
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreDenting fabrication of operators cabin cabin door along with replacement of panes 2 numbers all sides hand rail platform and ladder replacement both sides broken rear view mirror and fabrication of dumper dala rear side also overhauling of air
Denting fabrication of operators cabin cabin door along with replacement of panes 2 numbers all sides hand rail platform and ladder replacement both sides broken rear view mirror and fabrication of dumper dala rear side also overhauling of air
Read moreof your Industry type