Tender Details

Particulars Details
Title
Deposit Sp Rain Damages Emergency Work For Ts Road From 20/200km To State Boarder General Civil Work
Description
Deposit Sp Rain Damages Emergency Work&Amp#X0d For Ts Road From 20/200km To State Boarder General Civil Work
Organisation Irrigation Department | State Govt. and UT
Tender Id 2024_Irrig_675093_1
Reference
Number
IRR/PI/TR/4200/2024_5_1_1/1
Tender Fee 935
EMD 10578
Tender Value
Place Palakkayam
Link https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1049853
Start Date June 11, 2024 17:30
End Date

19/06/2024 ( Expired 377 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Stmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29

Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Consultancy services for authoritys engineer for supervision of work of up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, design length-55.150 chanderi link bypass in the state of madhya pradesh

Read more
Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation of shahgarh buxwaha narsinghgarh damoh section of nh-34 (from ch 113/00 to ch 176/500) to 2lane with paved shoulders in the state of madhya pradesh on epc mode

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Improvement work from maneshwar-rajpura motor road to lamkaniya sc colony under district plan.

Improvement work from maneshwar-rajpura motor road to lamkaniya sc colony under district plan.

Read more
Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Upgradation of abohar fazilka 4 lane plus ps road from km 0.00 to 7.00 fz-odr-08 (abohar city portion) in district fazilka including maintenance for 5 years (01 year defect liability period plus 04 years routine maintenance period)

Read more
Cc road construction work from vinod prajapati house to khaniyadhana bypass in ward number 14 chief minister infrastructure 4th phase additional approval

Cc road construction work from vinod prajapati house to khaniyadhana bypass in ward number 14 chief minister infrastructure 4th phase additional approval

Read more
Decorative pole with lamp work on both sides from jagannath chowk to ghantaghar road

Decorative pole with lamp work on both sides from jagannath chowk to ghantaghar road

Read more
Ac ksgh upgradation

Construction for infrastructure upgradation of ksghl from 60 beds to 250 beds, (residential part, non residential part, elect. part, and it infrastructure work) ud. rn-22000444., project id- hf222353129s000.-sitc of ac system at ipd and opd buildings

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise