Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Railway Infrastructure Project 🛠️ The Ministry Of Railways, Under The Central Government, Invites Tenders For The Comprehensive Development Of The Barauni Bachhwara Section Project, Including Barauni Yard Remodeling In Sonpur Division, East Central Railway. 🚧 📅 Tender Submission Deadline: April 05, 2024, 2:30 Pm The Scope Of Work Includes Linking Of B G Track, Spreading Of Ballast, Carriage Of Track Materials, Spreading Of Psc Sleepers, Linking And Packing Of Points And Crossings, And Other Related Activities. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 13,50,500 And Review The Complete Tender Document For Detailed Project Requirements. Keywords: Railway Infrastructure, Barauni Bachhwara Section, Barauni Yard Remodeling, East Central Railway, Tender, Project Development, Earnest Money Deposit| Particulars | Details |
|---|---|
| Title |
Linking B G Track, Spreading Of Ballast, Carriage Of P. Way Materials Spreading Of Psc Sleeper, Linking And Packing Of Points And Crossing, Etc. In Connection With 3rd &Amp 4th Line Work Of Barauni Bachhwara Section Project Including Barauni Yard Remodeling In Sonpur Division Of East Central Railway.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73569430 |
|
Reference Number |
ECR-CAO-C-N-ETN-70-23-24 |
| Tender Fee | 0 |
| EMD | 13.51 Lakh |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73569430/viewNitPdf_4479923.pdf |
| Start Date | March 13, 2024 01:50 |
| End Date |
Expired
05/04/2024
Expired 885 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
(1) sonpur division: bachhwara-chhapra katcheri :- through 1:12 point & xing sleeper renewal (p) of existing on psc 6 sleeper with new 60 kg psc 6 sleeper = 11 set (2) sonpur division: hajipur-bachhwara :-hrough 1:12 point & xing sleeper renewal (p) of existing on psc 6 sleeper with new 60 kg psc 6 sleeper = 11 set. (3)sonpur division: hajipur-chhapra katcheri:-through rail renewal (s) of existing 52 kg/90 uts rails on psc sleeper with sh 52kg/90uts rails at nyo loop line no-4 =
For complete deion and other details, please refer to tender
Read moreReplacement of existing railway track cst-9 steel sleeper and steel points and crossing to psc sleeper / psc points crossings works at alumina plant, nalco damanjodi
Replacement of existing railway track cst-9 steel sleeper and steel points and crossing to psc sleeper / psc points crossings works at alumina plant, nalco damanjodi
Read moreP way 1 in 8.5 points xing,p way sleeper 1 in 8.5,p way psc sleeper t 2496,p way psc sleeper t 4186
Read more
P way 1 in 8.5 points xing,p way sleeper 1 in 8.5,p way psc sleeper t 2496,p way psc sleeper t 4186
Read more
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p. way fittings, track ballast, psc sleeper and points and crossings, construction of ei building in connection with construction
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p. way fittings, track ballast, psc sleeper and points and crossings, construction of ei building in connection with construction
Read moreExecution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Execution of earthwork in formation, construction of minor bridges, blanketing, p. way linking works including supply of p-way fittings, track ballast, psc sleeper and points and crossings in connection with construction of railway infrastructure for
Read moreTrack linking for ballasted bg lwr/swr track linking of points and crossings including supply of p way small fittings and materials along with spreading of stone ballast on finished formation packing of track as well as points and crossings
For detail please refer nit
Read moreLinking of bg track on psc sleepers including assembling/laying of points and crossing, linking at level crossing and bridges, dismantling of bg track wherever required, unloading and spreading of ballast, unloading/ collection all p. way materials from different places to site, carting and stacking of released materials, carting of psc sleepers, ballast and rails etc. for remodeling of gonda yard (final phase) and other misc. work in connection with 3rd line between gd-buw of lucknow divi
For complete deion and other details, please refer to tender
Read moreDismantling of ci sleeper rails and erection of new psc sleepers rails supply of hard broken stone ballast handling
Dismantling of ci sleeper rails and erection of new psc sleepers rails supply of hard broken stone ballast handling
Read moreName of work:- design, drawing, modification, supply, erection, testing and commissioning of 25kv ohe and psi work of barauni-bachhwara section including teghara and bachhwara yard in lieu of 3rd and 4th line between barauni--bachhwara in sonpur division of east central railway and bagha-kharpokhara section including bagha yard in connection with sugauli-valmikinagar doubling work and any other location under jurisdiction of dy.cee/con/n/spj .
For complete deion and other details, please refer to tender
Read moreof your Industry type