Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Steel Gear Coupling (Full Gear), Model: Gc 101 & 102
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106260637 |
|
Reference Number |
L3236077 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Hubli |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/022024/106260637/viewNitPdf_4473520.pdf |
| Start Date | February 05, 2024 21:40 |
| End Date |
Expired
26/02/2024
Expired 961 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of gear coupling for ntpc farakka
Procurement of gear coupling for ntpc farakka
Read moreGear box and spares make model make elecon ii model and gear ratio 3 54
Gear box and spares make model make elecon ii model and gear ratio 3 54pbe 9 gr complete assembly for coc gearbox of g feeder for unit 5 ntpcbarh stage 2
Read more1600067399 gear coupling fgc 9, with shear pin arrangement
1600067399 gear coupling fgc 9, with shear pin arrangement
Read more1.71899003300 rotary gear pump, model: aerx-300l
1.71899003300 rotary gear pump, model: aerx-300l
Read moreCoupling, resilient make & model no: gbm no. 117 z (coupling cover matl: cs) , for 2600 mm dia. si. bc
Coupling, resilient make & model no: gbm no. 117 z (coupling cover matl: cs) , for 2600 mm dia. si. bc
Read moreDeutz xchange diesel engine, model no-bf4l2011 (55.1kw2800rpm) , make-deutz, full scope
Deutz xchange diesel engine, model no-bf4l2011 (55.1kw2800rpm) , make-deutz, full scope
Read moreGt-2 series 4032, model 6vu, pipe 150 nb, full flow 1190 lpm, 2 mercury switches, marking full flow/,gt-3 series 4022, model 4vd, pipe 100 nb, full flow 670 lpm, 2 mercury switches, marking pumpon/pump,gt-4 series 4022, model 4vu, pipe 100 nb, full flow 670 lpm, dial 100mm, 2 mercury switches, marking,gt-5 series 4022, model 4vu, pipe 100 nb, full flow 670 lpm, dial 100mm, 2mercury switches, marking
Gt-2 series 4032, model 6vu, pipe 150 nb, full flow 1190 lpm, 2 mercury switches, marking full flow/,gt-3 series 4022, model 4vd, pipe 100 nb, full flow 670 lpm, 2 mercury switches, marking pumpon/pump,gt-4 series 4022, model 4vu, pipe 100 nb, full flow 670 lpm, dial 100mm, 2 mercury switches, marking,gt-5 series 4022, model 4vu, pipe 100 nb, full flow 670 lpm, dial 100mm, 2mercury switches, marking
Read moreTn-ssp-101 supply of spares of voith make hydraulic coupling of id fans and fluid coupling of ball tube mills unit 1 to 6 at stps, suratgarh.
Supply of spares of voith make hydraulic coupling of id fans and fluid coupling of ball tube mills unit 1 to 6 at stps,suratgarh
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreConstruction of new toilets in existing store room, and painting works at room no-101 and 102 at cc-ii, iit kanpur.
Construction of new toilets in existing store room, and painting works at room no-101 and 102 at cc-ii, iit kanpur.
Read moreof your Industry type