Title
Design, Transportation And Supply,Providing Foundation,Erection,Supply,Installation,Cabling And Others,Supply Of Ug Cable,Laying Of Ug Cables,Supply And Laying,Maintenance Free Earthing,Installation Of Earthing,Provision Of Fencing,Making Concrete Cutting,Earth Excavation
Description
Design, Transportation And Supply,Providing Foundation,Erection,Supply,Installation,Cabling And Others,Supply Of Ug Cable,Laying Of Ug Cables,Supply And Laying,Maintenance Free Earthing,Installation Of Earthing,Provision Of Fencing,Making Concrete Cutting,Earth Excavation
Organisation Chennai Port Trust | NA
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD -
Tender Value -
Place
Link Login to view
Start Date October 08, 2026 21:55
End Date
Open 02/11/2026

17 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Repair, maint, servicing, calibration, rewinding of transformers, vcb rmu and ht oh line/ ug cables including earthing, god, la and other connected works for ht lines at dharamshala and charri camp mil stn under ge palampur.

Repair, maint, servicing, calibration, rewinding of transformers, vcb rmu and ht oh line/ ug cables including earthing, god, la and other connected works for ht lines at dharamshala and charri camp mil stn under ge palampur.

Read more
Maintenance of lt feeder pillar panel and various lt breakers including, replacement of old earthing and ug cables of married accommodation and otm accommodation at eme workshop, qmti map and range hills area under ge mh and rh khadki

Maintenance of lt feeder pillar panel and various lt breakers including, replacement of old earthing and ug cables of married accommodation and otm accommodation at eme workshop, qmti map and range hills area under ge mh and rh khadki

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Hffr 1100 voltage 1.5 sq. mm copper wire for very short light point with frls pvc conduit pipe,hffr 1100 voltage 1.5 sq. mm copper wire for short light point with frls pvc conduit pipe,hffr 1100 voltage 1.5 sq. mm copper wire for medium light point with frls pvc conduit pipe,hffr 1100 voltage 1.5 sq. mm copper wire for long light point with frls pvc conduit pipe,calling bell point long point,hffr 1100 voltage 2.5 sq.mm copper wire for very short light plug point with frls pvc conduit pipe,zhls 1100 voltage 4.0 sq.mm copper wire for medium power plug point with frls pvc conduit pipe,halogen free fire retardant copper conductor including earth wire,2 x 6 sqmm and 1x6 sqmm halogen free fire retardant copper conductor including earth wire,phenolic laminated switch board,8 way mcb db tp and n,earthing with g.i earth pipe,supply of salt and charcoal,6 to 32 amp dp mcb b series,luminaire with electronic ballast,installation testing commissioning of pre wired flourescent light,supply of angle holder,supply, insttalla

Hffr 1100 voltage 1.5 sq. mm copper wire for very short light point with frls pvc conduit pipe,hffr 1100 voltage 1.5 sq. mm copper wire for short light point with frls pvc conduit pipe,hffr 1100 voltage 1.5 sq. mm copper wire for medium light point with frls pvc conduit pipe,hffr 1100 voltage 1.5 sq. mm copper wire for long light point with frls pvc conduit pipe,calling bell point long point,hffr 1100 voltage 2.5 sq.mm copper wire for very short light plug point with frls pvc conduit pipe,zhls 1100 voltage 4.0 sq.mm copper wire for medium power plug point with frls pvc conduit pipe,halogen free fire retardant copper conductor including earth wire,2 x 6 sqmm and 1x6 sqmm halogen free fire retardant copper conductor including earth wire,phenolic laminated switch board,8 way mcb db tp and n,earthing with g.i earth pipe,supply of salt and charcoal,6 to 32 amp dp mcb b series,luminaire with electronic ballast,installation testing commissioning of pre wired flourescent light,supply of angle holder,supply, insttalla

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Rewiring of light fan exhaust fan call bell points with 1.5 sq.mm frls hffr copper cable including earth wire dismantling and laying through conduit complete as per dsr e and m 2025,wiring for light and power plug with 2x4 sq mm frls pvc insulated copper cable through pvc conduit with 4 sq mm frls pvc insulated copper cable for loop earthing complete as per dsr e and m 2025,wiring for circuit submain with earth wire frls pvc insulated copper conductor single core cable in surface recessed pvc conduit 2 x 2.5 sq. mm and 1 x 2.5 sq. mm earth wire as per dsr e and m 2025,supplying and fixing of 25mmx16mm cable trunking system casing capping with accessories in surface or recess including fitting on wall and making good the same as required,supply of 4x4 pvc junction box 1 and 2 and 3 ways.,supplying and fixing 2m box with frame and cover plate,supplying and fixing 3m box with frame and cover plate,supplying and fixing 4m box with frame and cover plate,supplying and fixing 6m box with frame and cover plate,supply

Rewiring of light fan exhaust fan call bell points with 1.5 sq.mm frls hffr copper cable including earth wire dismantling and laying through conduit complete as per dsr e and m 2025,wiring for light and power plug with 2x4 sq mm frls pvc insulated copper cable through pvc conduit with 4 sq mm frls pvc insulated copper cable for loop earthing complete as per dsr e and m 2025,wiring for circuit submain with earth wire frls pvc insulated copper conductor single core cable in surface recessed pvc conduit 2 x 2.5 sq. mm and 1 x 2.5 sq. mm earth wire as per dsr e and m 2025,supplying and fixing of 25mmx16mm cable trunking system casing capping with accessories in surface or recess including fitting on wall and making good the same as required,supply of 4x4 pvc junction box 1 and 2 and 3 ways.,supplying and fixing 2m box with frame and cover plate,supplying and fixing 3m box with frame and cover plate,supplying and fixing 4m box with frame and cover plate,supplying and fixing 6m box with frame and cover plate,supply

Read more
Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,sitc of free standing, outdoor cubicle type microprocessor based amf panel for 30 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 1.5sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supply and fixing the steel wire reinforced flexible upvc conduit,supplying and fixing of spn db,supplying and fixing of medium class pvc conduit,replacement of 12v, stop solenoid,replacement of 24v, stop solenoid,llop sensor,hct hwt sensor,sensor float,start stop relay,12 v or 24v oen pla relay,sf 40 mm dia gi pipe,dismantl

Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,sitc of free standing, outdoor cubicle type microprocessor based amf panel for 30 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 1.5sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supply and fixing the steel wire reinforced flexible upvc conduit,supplying and fixing of spn db,supplying and fixing of medium class pvc conduit,replacement of 12v, stop solenoid,replacement of 24v, stop solenoid,llop sensor,hct hwt sensor,sensor float,start stop relay,12 v or 24v oen pla relay,sf 40 mm dia gi pipe,dismantl

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 6 sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supplying and fixing of medium class pvc conduit,supplying and fixing of spn db,replacement of 12v, stop solenoid,llop sensor,hct hwt sensor,sensor float,dismantling of the existing dg control panel,rerouting of the existing cable

Sitc of free standing, outdoor cubicle type microprocessor based amf panel 15 kva,supplying, laying and fixing of al power cable in pipe,supplying, laying and fixing of al power cable on surface of wall,supplying, laying and fixing of al power cable in masonry open duct,supplying and making end termination with brass compression gland,supplying, laying and fixing of 8 c 1.5sq.mm pvc flexible cable,supplying and laying of 2 x 6 sq mm pvc insulated,supplying, laying of 16 sqmm size frls pvc insulated copper conductor,supplying and laying of industrial telephone cables,supplying and laying of dwc hdpe pipe,supplying and fixing of medium class pvc conduit,supplying and fixing of spn db,replacement of 12v, stop solenoid,llop sensor,hct hwt sensor,sensor float,dismantling of the existing dg control panel,rerouting of the existing cable