Tender Details

Particulars Details
Title
A/Mtc. Of Street Light Points Including On/Off Operation System In Various Sectors Of Mdc Area Panchkula, Sec 3, 31, Commercial Belt Sec 14, Iron Market Sec 15 Panchkula And Pinjore Kalka Urban Complex And Naraingarh For The Period Of 12 Months I.E.
Description
A/Mtc. Of Street Light Points Including On/Off Operation System In Various Sectors Of Mdc Area Panchkula, Sec 3, 31, Commercial Belt Sec 14, Iron Market Sec 15 Panchkula And Pinjore Kalka Urban Complex And Naraingarh For The Period Of 12 Months I.E.
Organisation Haryana Board Corporation | State Govt. and UT
Tender Id 2024_HBC_410324_1
Reference
Number
2024DE4BEE7F 5E44 4CAF B08D C3003AE62E53245HSV
Tender Fee 1680
EMD 29240
Tender Value
Place Panchkula Pinjore Kalka
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=486844
Start Date November 11, 2024 22:30
End Date

18/11/2024 ( Expired 221 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of rcc retaining wall at 45m wide circular road sector 3, 4, 5, pinjore kalka urban complex from rd 1070 to 1150 including 3 years mtc. and defect liability period free of cost.

Construction of rcc retaining wall at 45m wide circular road sector 3, 4, 5, pinjore kalka urban complex from rd 1070 to 1150 including 3 years mtc. and defect liability period free of cost.

Read more
Job no. 66.2025 hewp mtc. of all hort. works of shrub plants in green belt pocket no. i and ii in sec 25 and central verge no i on dividing road of sec 33 p i and sec 14 p ii developed under urban forest at u e hisar.

Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).

Read more
Job no. 65.2025 hewp mtc. of all hort. works of tree plants in green belt pocket no. 1 and 2 sec 25 central verge in sec 33 p-i and sec 14 p ii developed under urban forest at u.e. hisar

Rough cost estimate for development of urban forest in 5.0 acres area in 100mtr. wide green belt in sector-25, hsvp, hisar. (including one year free mtc. and defect liability period, free of cost).

Read more
Shifting of ht/lt poles and lines in sector-2, 4, 6 mdc area and sec- 18 and 19 u/e panchkula and sector 30 in pinjore kalka urban complex. (including one year free mtc./ defect liability period free of cost).

Shifting of ht/lt poles and lines in sector-2, 4, 6 mdc area and sec- 18 and 19 u/e panchkula and sector 30 in pinjore kalka urban complex. (including one year free mtc./ defect liability period free of cost).

Read more
Hiring of compressor at tw no.1 sector 30 pinjore kalka urban complex including cost of machinery tools and labour (a/mtc. of ph services in sector mdc area, panchkula extension and pinjore)

Hiring of compressor at tw no.1 sector 30 pinjore kalka urban complex including cost of machinery tools and labour (a/mtc. of ph services in sector mdc area, panchkula extension and pinjore)

Read more
Construction of fire station in sec- 30, pinjore kalka urban complex including civil works public health works fire fighting arrangements electrical fittings cctv works all other works contingent thereto including 5 year mtc and defect liability peri

Construction of fire station in sec- 30, pinjore kalka urban complex including civil works public health works fire fighting arrangements electrical fittings cctv works all other works contingent thereto including 5 year mtc and defect liability peri

Read more
Providing and laying of patches 90mm dbm 50mm thick bc including tack coat 30kg /100sqm on badly damaged external dividing 28/30 in pinjore kalka urban complex including 3 year mtc and defect liability period free of cost (a/mtc of ph services in sec

Providing and laying of patches 90mm dbm 50mm thick bc including tack coat 30kg /100sqm on badly damaged external dividing 28/30 in pinjore kalka urban complex including 3 year mtc and defect liability period free of cost (a/mtc of ph services in sec

Read more
Operation, repair and maintenance of water supply, sewerage, storm and fire fighting system of purab premium apartments, sector-88, sas nagar (for the period of 12 months i.e. 01-04-2025 to 31-03-2026

Operation, repair and maintenance of water supply, sewerage, storm and fire fighting system of purab premium apartments, sector-88, sas nagar (for the period of 12 months i.e. 01-04-2025 to 31-03-2026

Read more
Providing patch work 50mm thick bm and 30mm thick bc for internal road and services road in sector 30, pinjore kalka urban complex (pkuc) (a/mtc of public health services in sector 1 to 6 mdc sector 23 to 28, 31 and 32, panchkula extension )

Providing patch work 50mm thick bm and 30mm thick bc for internal road and services road in sector 30, pinjore kalka urban complex (pkuc) (a/mtc of public health services in sector 1 to 6 mdc sector 23 to 28, 31 and 32, panchkula extension )

Read more
Cleaning of jungle, sarkanda, canbasis plant on road berms to plot area upto 5 mtr both sides in sector 30, pinjore kalka urban complex complete in all respect as per satisfaction of eic (a/mtc of public health services in sector 1 to 6, mdc and sec

Cleaning of jungle, sarkanda, canbasis plant on road berms to plot area upto 5 mtr both sides in sector 30, pinjore kalka urban complex complete in all respect as per satisfaction of eic (a/mtc of public health services in sector 1 to 6, mdc and sec

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise