Tender Details

Particulars Details
Title
Chipping Hammer Heavy Weight
Description
Organisation STORES DEPARTMENT | Ministry of Railways
Tender Id GEM/2023/B/3636577
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date July 03, 2023 21:59
End Date
Expired 14/07/2023

Expired 1187 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: cancelled
Buyer Name: Ganesh Dutt
Ministry: Ministry Of Railways
Department: Stores Department
Organisation: Railway Board
Similar Tenders
Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years

Transportation of coal from gdk 2 and 2a incline to ocp-1 chp, rg-3 area on weight basis for a period of two years

Read more
Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Transportation of coal from ktk oc-iii,bhp area to gdk ocp-1 chp of rg-iii area on weight basis for a period of two months under unit rate system

Read more
Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of

Providing,laying & filling geo bags of size 1mx0.7m (type a 300gsm nonwoven) weight 420gm,volume of filled bag 0.07 cum,weight of filledf geobag 126kg with local sand including stiching in four lines by approved nylon thread with stiching machine and generator, stacking and placing after loading, unloading and carriage with the help of trolly within 150m lead and boat, including cess all complete as per specification and direction of e/i (where boat is used) total 5000 bags on the occasion of chat puja routes and all ghats as per nit under nagar nigam munger

Read more
Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Hiring of 4nos of front end loaders of capacity 3.0 -3.5cu.m with 24hours availability on weight(tonnage) basis for a period of 2 years for use at loading of coal into railway wagons at wharfloading platform chp,yellandu area.

Read more
Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Transportation of coal from srp groups of mines (srp-1 and srp-3 and 3a inclines) to srpchp on weight basis under unit rate basis for a period of six (6) months as per the scope of work, terms and conditions of nit.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise