Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Reconditioning Of Worn Out Tongue Rail In 1 In 8.5 Turn Out And Wheel Burn Rails Of Mppgcl Private Bg Railway Siding From Ghoradongri To Sarni And Yard At Stps, Sarni.
|
Description |
Reconditioning Of Worn Out Tongue Rail In 1 In 8.5 Turn Out And Wheel Burn Rails Of Mppgcl Private Bg Railway Siding From Ghoradongri To Sarni And Yard At Stps, Sarni.
|
Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
Tender Id | 2024_MPPGC_374643_1 |
Reference Number |
cwt4704 |
Tender Fee | 795 |
EMD | 7800 |
Tender Value | |
Place | Sarni |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=443435 |
Start Date | October 15, 2024 23:30 |
End Date |
04/11/2024 ( Expired 243 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl, sarni at stps
Work of providing consultancy services to carryout assessment/feasibility survey/study for erection and commissioning of elevated pipe conveyor belt system from upcoming coal mines of wcl withing 40 km to stps, mppgcl, sarni at stps
Read moreRepairing/rebuilding of worn out housing of arm and bucket cylinder then co-axial/line boring to its original size in pc2000-8 (k-1) hydraulic shovel at amlohri project.
Repairing/rebuilding of worn out housing of arm and bucket cylinder then co-axial/line boring to its original size in pc2000-8 (k-1) hydraulic shovel at amlohri project.
Read moreDismantling of swd rcc top slab and re-construction of top slab and desilting of mrts railway road swd from bhuvaneshwari nagar 1st main road to six vent culvert reach - 1 (south side) in division-177, unit-39, zone-13.
Dismantling of swd rcc top slab and re-construction of top slab and desilting of mrts railway road swd from bhuvaneshwari nagar 1st main road to six vent culvert reach - 1 (south side) in division-177, unit-39, zone-13.
Read moreDismantling of swd rcc top slab and re-construction of top slab and desilting of mrts railway road swd from bhuvaneshwari nagar 1st main road to six vent culvert reach - 1 (north side) in division-177, unit-39, zone-13.
Dismantling of swd rcc top slab and re-construction of top slab and desilting of mrts railway road swd from bhuvaneshwari nagar 1st main road to six vent culvert reach - 1 (north side) in division-177, unit-39, zone-13.
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1f
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1f
Read moreRepair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery
Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreRepairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Read moreTransportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Transportation of 552 mtr. trackline total rail length 1104 mtr materials from surface/previous panel and fitting them from 4d/74l to 20d/74l, lhcm-1 in r-viia seam
Read moreTender for supply of 60 kg and 52 kg rail gule joints for mppgcls railway siding from surgaon banjari to bir railway station (60 kg rail) and from bir railway station to plant sstpp (52 kg rail) of mppgcl, dongaliya distt. khandwa.
Tender for supply of 60 kg and 52 kg rail gule joints for mppgcls railway siding from surgaon banjari to bir railway station (60 kg rail) and from bir railway station to plant sstpp (52 kg rail) of mppgcl, dongaliya distt. khandwa.
Read moreof your Industry type