Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Transportation Of Hp Turbine Module With Stand Of 250 Mw ,Unit 6, Sstps From Sstps,Suratgarh To M/S Bhel, Haridwar And After Repairing M/S Bhel, Haridwar To Sstps, Suratgarh On Door Delivery Basis
|
| Description |
Transportation Of Hp Turbine Module With Stand Of 250 Mw ,Unit 6, Sstps From Sstps,Suratgarh To M/S Bhel, Haridwar And After Repairing M/S Bhel, Haridwar To Sstps, Suratgarh On Door Delivery Basis
|
| Organisation | RRVUN - CMD | State Govt. and UT |
| Tender Id | 2025_RRVUN_520028_1 |
|
Reference Number |
TN-3177 TM |
| Tender Fee | 736 |
| EMD | 18820 |
| Tender Value | - |
| Place | SSTPS, SUratgarh |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=927538 |
| Start Date | December 13, 2025 14:30 |
| End Date |
Expired
23/12/2025
Expired 296 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Procurement of complete hp turbine module and ip turbine module assembly of make bhel for 250 mw kwu turbine set of unit no. 10 and 11, ph-iv, stps, sarni.
Read moreProcurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Procurement of kwu design complete hp turbine module and ip turbine module 01 set each for bhel make 500 mw turbine set of unit no. 5 of sgtps, birsinghpur.
Read moreTn-mm-2213 supply of spares of electronic rf level switch rf-550 system for esp 250 mw unit 1 to 6 at sstps suratgarh rajasthan
Tn-mm-2213 supply of spares of electronic rf level switch rf-550 system for esp 250 mw unit 1 to 6 at sstps suratgarh rajasthan
Read moreVarious works related to turbine mot/ ca area, per shift per unit of stage i to iv (unit-1 to 6) of sstps suratgarh for 12 months
Various works related to turbine mot/ ca area, per shift per unit of stage i to iv (unit-1 to 6) of sstps suratgarh for 12 months
Read moreProcurement of various types of bhel make manual valves installed at turbine area of 1x500 mw unit sgtps birsinghpur.
Procurement of various types of bhel make manual valves installed at turbine area of 1x500 mw unit sgtps birsinghpur.
Read moreAnnual maintenance contract for turbine and auxiliaries including cooling towers of 250 mw unit 8 300 mw unit 7 plant water package system unit 7 and 8 and raw water intake of unit 8 dpps dpl
Annual maintenance contract for turbine and auxiliaries including cooling towers of 250 mw unit 8 300 mw unit 7 plant water package system unit 7 and 8 and raw water intake of unit 8 dpps dpl
Read moreWork of routine and breakdown maintenance of turbine, heat exchangers and their components and operation and routine break-down maintenance of 2 nos. of eot cranes (125/25 mt) in tg hall, of sstps unit - 1 to 6 (6x250mw),suratgarh
Work of routine and breakdown maintenance of turbine, heat exchangers and their components and operation and routine/break-down maintenance of 2 nos. of eot cranes (125/25 mt) in tg hall, of sstps unit - 1 to 6 (6x250mw),suratgarh.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit job contract for capital overhaul of unit 4 and lpt paut overhaul of unit 1 and 2 of 250 mw unit turbine of ntpc brbcl kwu design as per sow
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - industry unit job contract for capital overhaul of unit 4 and lpt paut overhaul of unit 1 and 2 of 250 mw unit turbine of ntpc brbcl kwu design as per sow
Read moreLiner 90 x 100 x 4 mm thick . drawing no :- wx-26003 (alt-nil) (refer l.no. rdso l.no mw plng. csnb dt 02/02/26). spec :-i) contr-lccf 20(c)-96-(rev-3). ii) as per is 3885, pt.1 gr/4 (bhn 380-420) ( warranty period: 72 months after the date of delivery)
Liner 90 x 100 x 4 mm thick . drawing no :- wx-26003 (alt-nil) (refer l.no. rdso l.no mw plng. csnb dt 02/02/26). spec :-i) contr-lccf 20(c)-96-(rev-3). ii) as per is 3885, pt.1 gr/4 (bhn 380-420) ( warranty period: 72 months after the date of delivery)
Read moreInspection of bearings and mpi nft of freestanding blades last two stages of turbine unit 6 250 mw sstps suratgarh
Inspection of bearings and mpi nft of freestanding blades last two stages of turbine unit 6 250 mw sstps suratgarh
Read moreof your Industry type