Tender Details

Particulars Details
Title
Supplying And Making Straight Through Cable Jointing Kit And End Termination , Pole Mounting Cable Jointing Kit Of 70 Sqmm And 50 Sqmm , 11 Kv/3.3 Kv Grade Cables At Main Substation Of Karma Ocp Under Kuju Area.
Description
Supplying And Making Straight Through Cable Jointing Kit And End Termination , Pole Mounting Cable Jointing Kit Of 70 Sqmm And 50 Sqmm , 11 Kv/3.3 Kv Grade Cables At Main Substation Of Karma Ocp Under Kuju Area.
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2024_CCL_318611_1
Reference
Number
GM (K)/EnM/eTender/24-25/177
Tender Fee 0
EMD 3100
Tender Value
Place GM UNIT KUJU
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=330241
Start Date October 04, 2024 16:30
End Date

15/10/2024 ( Expired 187 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Supply of heat-shrinkable type cable straight through joints and cable end termination kits suitable for 33 kv and 11 kv xlpe cables

Supply of heat-shrinkable type cable straight through joints and cable end termination kits suitable for 33 kv and 11 kv xlpe cables

Read more
Day to day maintenance / repair of electrical installations of 3.3kv,(lts feeder), 440v oh line,cable, light fitting work from lingaraj ocp main substation to lingaraj township and inside the colony premises of lingaraj area for a period of two years

Day to day maintenance / repair of electrical installations of 3.3kv,(lts feeder), 440v oh line,cable, light fitting work from lingaraj ocp main substation to lingaraj township and inside the colony premises of lingaraj area for a period of two years

Read more
Supplying and making straight through cable jointing kit and end termination (pole mounting) cable jointing kit of 70 sq.mm, 11kv/3.3 kv grade cables at main substation of karma ocp under kuju area

Supplying and making straight through cable jointing kit and end termination (pole mounting) cable jointing kit of 70 sq.mm, 11kv/3.3 kv grade cables at main substation of karma ocp under kuju area

Read more
Providing and fixing of 3 core cable straight through jointing kit 70 sq mm/95 sq.mm fitted of cable and terminator kit for 3.3kv ht line of lajkura open cast project, ibva.

Providing and fixing of 3 core cable straight through jointing kit 70 sq mm/95 sq.mm fitted of cable and terminator kit for 3.3kv ht line of lajkura open cast project, ibva.

Read more
Installation of 1.6 mva power transformer and 500kva 3.3kv/440volt transformer with bus bar, earthing arrangement , renovation of 440volt oh for providing power to movable mobile crusher at coal stock at karma main substation under kuju area

Installation of 1.6 mva power transformer and 500kva 3.3kv/440volt transformer with bus bar, earthing arrangement , renovation of 440volt oh for providing power to movable mobile crusher at coal stock at karma main substation under kuju area

Read more
Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.

Supply and fixing of ngr 3.3kv 10 amp, 190 ohms for 3 nos., 1 mva, 11kv/3.3kv (2 nos.) and 1.6 mva, 11kv/3.3 kv (01 no.) power transformer installed at main and banwar substation at topa project under kuju area.

Read more
Maintenance and repairing at site of buchloz relay alarm bell system of 02 nos of 1mva,11kv/3.3kv power transformer at main substation and mine substation of karma project under kuju area.

Maintenance and repairing at site of buchloz relay alarm bell system of 02 nos of 1mva,11kv/3.3kv power transformer at main substation and mine substation of karma project under kuju area.

Read more
Repairing and reconditioning of 1 no. 11kv meditron make vcb and 01 no. 3.3kv mineline make vcb installed at main substation and mines of topa ocp under kuju area.

Repairing and reconditioning of 1 no. 11kv meditron make vcb and 01 no. 3.3kv mineline make vcb installed at main substation and mines of topa ocp under kuju area.

Read more
Providing uninterrupted power supply to cctvs surveillance system installed at coke stock and crusher point location by using aerial bunch cable 70 sqmm 4 core from 200kva dg set installed at karma project under kuju area.

Providing uninterrupted power supply to cctvs surveillance system installed at coke stock and crusher point location by using aerial bunch cable 70 sqmm 4 core from 200kva dg set installed at karma project under kuju area.

Read more
Supplying and making straight through cable jointing kit and end termination (pole mounting) cable jointing kit of 70 sq.mm, 11kv/3.3 kv grade cables at main substation of karma ocp under kuju area

Supplying and making straight through cable jointing kit end andtermination (pole mounting) cable jointing kit of 70 sq.mm, 11kv/3.3 kv grade cables at main substation of karma ocp under kuju area

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise