Tender Details
Particulars | Details |
---|---|
Title |
Tn No. 3938/3 A Dated 3. Special Repair Work Of Kulchandpur Nathodi Road From Bhagwanpur Gagalhedi Road Via Ashawali.
|
Description |
Special Repair Work Of Kulchandpur Nathodi Road From Bhagwanpur Gagalhedi Road Via Ashawali.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_CEMRT_859172_3 |
Reference Number |
TN No 3938/3A dated 25.10.2023 |
Tender Fee | 854 |
EMD | 2.64 Lakh |
Tender Value | |
Place | EE PD PWD Saharanpur |
Link | https://etender.up.nic.in |
Start Date | November 03, 2023 20:30 |
End Date |
08/11/2023 ( Expired 563 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of drainage and interlocking work from the house of maulvi badruzzama in ward no. 07, bhadasa nayapura, passing through kefaayatullah, the mosque, to the houses of ansari ahmed, shameem, zafer, and abu saiyba.
Construction of drainage and interlocking work from the house of maulvi badruzzama in ward no. 07, bhadasa nayapura, passing through kefaayatullah, the mosque, to the houses of ansari ahmed, shameem, zafer, and abu saiyba.
Read moreWidening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)
Read morePeriodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25
Read moreOne time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
One time improvement of shillong-jowai road including construction of pucca side drain with footpath from km 54.200 to 69.200 km length 15.00 km in the state of meghalaya . job no. 44-mg-2024-25-178
Read moreWbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreImprovement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Read moreIe services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Ie services for construction of new six lane access controlled capital region ring road from gobindpur (nh 55) to tangi from km. 70.995 to km. 111.325 in the state of odisha under nh(o) on hybrid annuity mode (package 3)
Read moreof your Industry type