38/2024 25/Edcr Shifting Of 33 Kv Line Of Milak Substation As Per Request Of Sr. Vimal Kumar Under Deposit Scheme Under Jurisdiction Edd Milak, Rampur
Description
38/2024 25/Edcr Shifting Of 33 Kv Line Of Milak Substation As Per Request Of Sr. Vimal Kumar Under Deposit Scheme Under Jurisdiction Edd Milak, Rampur
Organisation Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_PVVNL_979790_1
Reference
Number
38/2024-25(EDCR)
Tender Fee 1180
EMD 2000
Tender Value
Place office of the SE EDC RAMPUR
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1723653
Start Date December 03, 2024 22:30
End Date

18/12/2024 ( Expired 143 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Extension of distribution pipe line connecting existing household connection with distribution pipeline in various villages as per site requirement and other appurtenant works under dewalchaura gov pumping water supply scheme

Extension of distribution pipe line connecting existing household connection with distribution pipeline in various villages as per site requirement and other appurtenant works under dewalchaura gov pumping water supply scheme

Read more
Work of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar

Work of 33 kv underground cabling (33 kv xlpe cable, 3x300 mm) (02 nos.) for railway crossing at nad-ujn sec. bet station pso-asl station track location no. 31/10-11 as per layout drawing under sanction project by onm dn barnagar

Read more
Shifting of 33 kv, 11 kv dtr and lt line under proposed kanyakhedi dam at village kanyakhedi under mehatwad d/c

Shifting of 33 kv, 11 kv dtr and lt line under proposed kanyakhedi dam at village kanyakhedi under mehatwad d/c

Read more
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Repairing, overhauling work of 11 kv incoming and outgoing vcb installed at 33/11 kv sub station nadarganj new/old, utrethiya new/old, ambedkar university, gehru, bani, sharda nagar under jurisdiction of e.e. edd.-nadarganj, amousi zone, lucknow

Repairing, overhauling work of 11 kv incoming and outgoing vcb installed at 33/11 kv sub station nadarganj new/old, utrethiya new/old, ambedkar university, gehru, bani, sharda nagar under jurisdiction of e.e. edd.-nadarganj, amousi zone, lucknow

Read more
For the work of construction of lt/ 11 kv line for releasing new connections and additional load and line/pole shifting etc. work under the jurisdiction of electricity urban distribution division-ii, moradabad (in deposit scheme).

For the work of construction of lt/ 11 kv line for releasing new connections and additional load and line/pole shifting etc. work under the jurisdiction of electricity urban distribution division-ii, moradabad (in deposit scheme).

Read more
Construction of 33 kv line

Construction of 33 kv line for issuing 5900 kva electrical connection to gm, nhidcl silkyara under edd uttarkash.i

Read more
The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)

The work of overhead line maintenance, shifting, realigning etc on as and when required basis during the period till upcoming monsoons in kabribab mine, giridih project, giridih area (under monsoon action plan 25)

Read more
Earth filling work at 33/11 kv substation dhoom manikpur, dadri distt gautam budh nagar under the scheme of business plan 2024-25

Earth filling work at 33/11 kv substation dhoom manikpur, dadri distt gautam budh nagar under the scheme of business plan 2024-25

Read more
Construction of 33 kv line from 132_33 kv s_s gida gorakhpur to suthani sahjanwa waste to charcol and cng plant 6 mva distt_gorakhpur for un-intrrepted 24 hours power supply under the head of deposit scheme year 2024_25

Construction of 33 kv line from 132_33 kv s_s gida gorakhpur to suthani sahjanwa waste to charcol and cng plant 6 mva distt_gorakhpur for un-intrrepted 24 hours power supply under the head of deposit scheme year 2024_25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise