Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Nad Kota Section: Widening &Amp Repairs To Cess &Amp Slope Of Bank Under The Jurisdiction Of Aden/Rma In Connection With 160 Kmph Speed Raising Of Nad Mtj Section.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77827384 |
Reference Number |
175-2024R |
Tender Fee | 0 |
EMD | 2.62 Lakh |
Tender Value | |
Place | Jabalpur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77827384/viewNitPdf_4735467.pdf |
Start Date | October 10, 2024 16:06 |
End Date |
07/11/2024 ( Expired 235 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Widening to four lane with paved shoulders from nh chainage km. 105.780 sh chainage km. 537.500 to km. 128.080 sh chainange 559.800 yedegowdanahalli to arjunahalli section of nh-373 in the state of karnataka on ham under nho annual plan 2023 24
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreExecution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to
Execution of slope protection work with construction of retaining wall work in km 155.240 to km 155.400 and 155.500 to 155.840, on risk and cost basis of contractor under rehabilitation and upgradation of kashedi ghat section of nh-17 (new nh-66) to
Read moreConst. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr
Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi canal road near siba sakti club to main road nh side in connection with s/s, under watco section ggp colony, bbsr
Read moreConst. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi gali-2 (anandi charan nayak side house) in connection with s/s, under watco section ggp colony, bbsr
Const. of inspection chamber, raising of manhole and laying of sewer line for commissioning of s/s laid by owssb through ecci at nuasahi gali-2 (anandi charan nayak side house) in connection with s/s, under watco section ggp colony, bbsr
Read moreConstruction of inspection chamber, raising of manhole and laying of sewer line for cleaning and commissioning of sewerage system laid by owssb through ecci at srusti villa in connection with sewerage system, under watco section ggp colony, bbsr
Construction of inspection chamber, raising of manhole and laying of sewer line for cleaning and commissioning of sewerage system laid by owssb through ecci at srusti villa in connection with sewerage system, under watco section ggp colony, bbsr
Read moreTender for the work of arranging power supply to 1no. 3 ph ltd services connection in ward no. 1 near zoaib driving school, valpoi in the jurisdiction of section office valpoi under sub division iii valpoi goa.
Tender for the work of arranging power supply to 1no. 3 ph ltd services connection in ward no. 1 near zoaib driving school, valpoi in the jurisdiction of section office valpoi under sub division iii valpoi goa.
Read moreWork for releasing ltag power supply to pump house of shri. narendranath naik gaonkar in sy. no.92/9 vall agonda for a load of 2hp under agonda section office in the jurisdiction of sub division-iii, canacona, division-xvi, margao.
Work for releasing ltag&#x0d power supply to pump house of shri. narendranath&#x0d naik gaonkar in sy. no.92/9 vall agonda for a load&#x0d of 2hp under agonda section office in the&#x0d jurisdiction of sub division-iii, canacona,&#x0d division-xvi, margao.
Read moreMonsoon safety team 2025-26 preparedness and disater management in ghmc area monsoon safety team for co-ordination with ghmc officials to cope with flooding areas during monsoon, providing man mazdoor, vehicles to all sections under the jurisdiction of o m divn.no.xiv for the period of 3 months from june 2025 to august 2025 under ramanthapur section, sd-ii, om divn.no.xiv.
Monsoon safety team 2025-26 preparedness and disater management in ghmc area monsoon safety team for co-ordination with ghmc officials to cope with flooding areas during monsoon, providing man mazdoor, vehicles to all sections under the jurisdiction of o and m divn.no.xiv for the period of 3 months from june 2025 to august 2025 under ramanthapur section, sd-ii, o and m divn.no.xiv.
Read moreof your Industry type