Tender Details
Particulars | Details |
---|---|
Title |
Pr Of Road From Pecharthal Kanchanpur Road To Pecharthal Kanchanpur Road Via Akshaymoni School During The Year 2023 2024 Total Length 3 Point 20 Km Sh Patch Solling Patch Mettaling Carpeting And Seal Coat Work From Ch 0 Point 00 Km To 1point 60 Km Gr
|
Description |
Pr Of Road From Pecharthal Kanchanpur Road To Pecharthal Kanchanpur Road Via Akshaymoni School During The Year 2023 2024 Total Length 3 Point 20 Km Sh Patch Solling Patch Mettaling Carpeting And Seal Coat Work From Ch 0 Point 00 Km To 1point 60 Km Gr
|
Organisation | Government of Tripura |
Tender Id | 2023_CEPWD_39133_1 |
Reference Number |
28/EE/KD/2023-24 |
Tender Fee | 1000 |
EMD | 47983 |
Tender Value | |
Place | Executive Engineer Kumarghat division PWD R and B |
Link | https://tripuratenders.gov.in |
Start Date | June 07, 2023 22:45 |
End Date |
28/06/2023 ( Expired 682 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreFdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Fdr to road from kamthana bazar to ibb road (l_0point90 km) under kaiyadhepa gp during the year 24_25_sh flat brick soling,edge soling, wbm_iii, grouting, carpeting and other ancillary works_portion from ch 0 to ch 0point90 km upto ibb road_2nd call
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreUpgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Upgradation of road from nh 08 to depacherra road via dayal para awc under pecharthal assembly constituency of pwd r and b kumarghat division length 2 30 km under the scheme for special assistance to states for capital investment for 2024 25_2nd
Read moreConstruction of cc road from bikash bharati school to rasmi more via salboni asta road within bandhgora gp under jhargram block in the district of jhargram. total road length 0.850 km
Construction of cc road from bikash bharati school to rasmi more via salboni asta road within bandhgora gp under jhargram block in the district of jhargram. total road length 0.850 km
Read moreMaintenance of different pwd roads under khumulwng sub-division during the year 2025-26 sh shelmac, patch grouting, patch carpeting, tack coat, seal coat, palasiding and other allied work. (gr i)
Maintenance of different pwd roads under khumulwng sub-division during the year 2025-26 sh shelmac, patch grouting, patch carpeting, tack coat, seal coat, palasiding and other allied work. (gr i)
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch.0.50 km to ch.1.25 km) group i.
Read moreMtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Mtc of road from mandai road to bishrambari via narayanbari during the year 2025-26 sh patch soling, patch metalling, re-carpetting, road side pucca drain and other allied works. (l 0.75 km, ch. 1.25 km to ch.2.00 km) group ii.
Read moreMtc of road from boim cherra to jhulan tilla (ch. 0.00 to 1.00 km, length 1.00 km) and pmgsy road from kayachanbari to kathal bagan(ch. 0.00 to 2.80 km, length 2.80 km) under pwd (r and b) jirania sub division during the year 2025-2026..
Mtc of road from boim cherra to jhulan tilla (ch. 0.00 to 1.00 km, length 1.00 km) and pmgsy road from kayachanbari to kathal bagan(ch. 0.00 to 2.80 km, length 2.80 km) under pwd (r and b) jirania sub division during the year 2025-2026..
Read moreWidening and strenghtening of bt road from sh 20b kuchore athuni to shri kheraj bhomiya gaushala via kuchore aguni km 0/0 to 6/0
Widening and strenghtening of bt road from sh 20b kuchore athuni to shri kheraj bhomiya gaushala via kuchore aguni km 0/0 to 6/0
Read moreof your Industry type