Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply And Carriage Of Pea Gravel 2.00mm To 3.35mm Size From Lalkuwan To Gauri Bazar Store Deoria, Tubewell Construction Division Gorakhpur.
|
Description |
Supply And Carriage Of Pea Gravel 2.00mm To 3.35mm Size From Lalkuwan To Gauri Bazar Store Deoria, Tubewell Construction Division Gorakhpur.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDM_849443_1 |
Reference Number |
984/TCDGKP/ DT 07-10-2023 |
Tender Fee | 854 |
EMD | 60732 |
Tender Value | |
Place | EE TCD OFFICE GORAKHPUR |
Link | https://etender.up.nic.in |
Start Date | October 16, 2023 15:30 |
End Date |
25/10/2023 ( Expired 613 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Work of installation , erection , dismantling of 1x10 mvar capacitor bank unit and carriage of capacitor bank from 400/132 kv s/s sector-123, noida to 132/33 kv s/s rudrapur and other associated work at 132 kv s/s rudrapur under etd, deoria
Work of installation , erection , dismantling of 1x10 mvar capacitor bank unit and carriage of capacitor bank from 400/132 kv s/s sector-123, noida to 132/33 kv s/s rudrapur and other associated work at 132 kv s/s rudrapur under etd, deoria
Read moreConstruction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal equipments and control room for providing power supply to indian agricultural research institute under ghilamara electrical sub-division of north lakhimpur electrical c
Construction of 33 kv line and 33/11 kv, 2.5 mva sub-station including terminal &#x0d equipments and control room for providing power supply to indian agricultural research &#x0d institute under ghilamara electrical sub-division of north lakhimpur ec
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction work of drain and cc road from gauri agrawal to azad mandir and from ashoka foam to virendras house in ward-64 siklapuri.
Construction work of drain and cc road from gauri agrawal to azad mandir and from ashoka foam to virendras house in ward-64 siklapuri.
Read moreConstruction of road from main road to sos mess, or mess galley and provn of store and mt pool at mundra under
Construction of road from main road to sos mess, or mess galley and provn of store and mt pool at mundra under
 age (i) (cg) jakhau
Read moreContract for ash brick production operation of ash brick plant including supply transportation of bottom ash sand transporation of cement from ntpc store and dfa from ash silo to brick manufacturing plant at ntpc lara
Contract for ash brick production operation of ash brick plant including supply and transportation of bottom ash sand transportation of cement from ntpc store and dfa from ash silo to brick manufacturing plant at ntpc lara
Read moreDevelopment of road during the year 2025_26_sh_ mtc. of road from narayanpur bazar to sripally extended upto airport corner amc ward no. 1 and 2 under construction sub_division no.ii pwd(randb) _sh_ road side shoulder mtc. construction of embankment,
Development of road during the year 2025_26_sh_ mtc. of road from narayanpur bazar to sripally extended upto airport corner amc ward no. 1 and 2 under construction sub_division no.ii pwd(randb) _sh_ road side shoulder mtc. construction of embankment,
Read moreConstruction of atal path in village 2 sgm from mehandipur balaji temple to krishna temple via verma kiryana store and bajigar chauraha at km. 0/0 to 1/100
Construction of atal path in village 2 sgm from mehandipur balaji temple to&#x0d krishna temple via verma kiryana store and bajigar chauraha at km. 0/0 to 1/100
Read more2-construction work of cc road and drain from janual general store to rais s house in village fazalpur habib.
2-construction work of cc road and drain from janual general store to rais s house in village fazalpur habib.
Read moreof your Industry type