Tender Details
Particulars | Details |
---|---|
Title |
Estimate For Interconnection Of 11 Kv Gurri Pump Feeder To 11 Kv Maanpura Pump Feeder At Gurri Under Utila D/C Under Sstd Scheme
|
Description |
Estimate For Interconnection Of 11 Kv Gurri Pump Feeder To 11 Kv Maanpura Pump Feeder At Gurri Under Utila D/C Under Sstd Scheme
|
Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
Tender Id | 2024_MKVVC_375153_1 |
Reference Number |
DGM/STC/OnM/24/2500 MAHALGOAN GWL 07-10-24 |
Tender Fee | 531 |
EMD | 2300 |
Tender Value | |
Place | Mr. SPS TOMAR PUTLIGHAR MAHALGAON GWALIOR |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=441473 |
Start Date | October 09, 2024 16:00 |
End Date |
21/10/2024 ( Expired 208 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSelection of epc contractor for integrated manufacturing cluster imc palakkad
Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreAAAAAAAAAA
Login to viewSupply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.
Read moreAAAAAAAAAA
Login to viewSupply and installation of submersible pump motor sets at expected flood affected river bed sites tubewells with supply of necessary substitutes at different water supply scheme under kashipur block under pmd, phe dte. in the district of purulia.
Read moreProvn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreof your Industry type