Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Four Lane With Paved Shoulder Of Darbhanga Dilli More Banwari Patti From Km 0.000 To Km 14.950 Package 1 Of Nh 105 New Nh 527 B In The State Of Bihar.
|
| Description |
Construction Of Four Lane With Paved Shoulder Of Darbhanga Dilli More Banwari Patti From Km 0.000 To Km 14.950 Package 1 Of Nh 105 New Nh 527 B In The State Of Bihar.
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_875426_1 |
|
Reference Number |
NIT NO.-01/NH/JAYNAGAR/EPC/2025-26 |
| Tender Fee | 30000 |
| EMD | 2.86 Crore |
| Tender Value | |
| Place | As per NIT/RFP |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=920251 |
| Start Date | September 01, 2025 20:30 |
| End Date |
Expired
15/10/2025
Expired 264 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of four lane with paved shoulder of darbhanga (dilli more) - banwari patti from km 0.000 to km 14.950 (package-1) of nh-105 (new nh-527b) in the state of bihar
Construction of four lane with paved shoulder of darbhanga (dilli more) - banwari patti from km 0.000 to km 14.950 (package-1) of nh-105 (new nh-527b) in the state of bihar
Read moreShort term maintenance contracts(stmc) of nh105(newnh 527b) from km 0.00 to 14.950 (dilli more to banwari patti) and nh 527a from km 0.00 to km 28 (pakharauni chawk to near jhanjharpur)(total length 15.998km) for the year2023-24 in the stateof bihar
Short term maintenance contracts(stmc) of nh105(newnh 527b) from km 0.00 to 14.950 (dilli more to banwari patti) and nh 527a from km 0.00 to km 28 (pakharauni chawk to near jhanjharpur)(total length 15.998km) for the year2023-24 in the stateof bihar
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreConsultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in uttarakhand
Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in uttarakhand
Read moreConsultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in the state of uttarakhand (3rd call)
Consultancy services for preparation of dpr for widening of existing two lane with paved shoulder to four lane with paved shoulder from km 0.00 (sitarganj) to km 52.200 (tanakpur) of nh-125 (new nh-09) in the state of uttarakhand (3rd call)
Read moreStrengthening of two lane with paved shoulder from km17/8 18/2, construction of two lane with paved shoulder from km 18/2 to km 20/0 and construction of four lane with paved shoulder from km 20/0 to km 35/6 of salem -thirupathur -vaniyambadi road
Strengthening of two lane with paved shoulder from km17/8 -18/2, construction of two lane with paved shoulder from km 18/2 to km 20/0 and construction of four lane with paved shoulder from km 20/0 to km 35/6 of salem -thirupathur- vaniyambad
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.74.135 near honaganahalli to km.261.483 near hubballi of nh 52 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.74.135 near honaganahalli to km.261.483 near hubballi of nh 52 in the state of karnataka
Read moreUpgradation to four lane with paved shoulder of kalavad-jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat on hybrid annuity mode.
Upgradation to four lane with paved shoulder of kalavad-jamnagar section (package-ii) of nh-927d from design km 0.000 (ex. km 50.925) to design km 47.572 (ex. km 3.720) in the state of gujarat on hybrid annuity mode.
Read moreof your Industry type