Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Six Lane Greenfield Patna Ring Road Highway (Nh131 G) From Kanhauli To Sherpur (From Km. 0.000 To Km 8.480) Including Junction Development With Bihta Danapur Elevated Corridor (Length1.5 Km) (Tl 9.98 Km.) In Bihar.
|
Description |
Construction Of Six Lane Greenfield Patna Ring Road Highway (Nh131 G) From Kanhauli To Sherpur (From Km. 0.000 To Km 8.480) Including Junction Development With Bihta Danapur Elevated Corridor (Length1.5 Km) (Tl 9.98 Km.) In Bihar.
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 40000 |
EMD | 3.63 Crore |
Tender Value | |
Place | NHAI HQ |
Link |
AAAAAAAAAA Login to view |
Start Date | March 17, 2025 19:10 |
End Date |
09/07/2025 ( 27 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreConstruction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Construction of six lane greenfield patna ring road highway (nh131g) from kanhauli to sherpur (from km. 0.000 to km 8.480) including junction development with bihta danapur elevated corridor (length1.5 km) (tl 9.98 km.) in bihar.
Read moreConstruction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.
Read moreConstruction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.
Read moreConstruction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Construction of four lane with paved shoulder of bhagalpur kharhara village (dhaka more) from km 0.000 to km 36.600 (total length 36.600 km) of nh-133e in the state of bihar on epc mode
Read moreIe services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Ie services for construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km. 0.000 to km. 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreConstruction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Construction of new six lane access controlled capital region ring road from rameshwar (nh 16) to bilipada from km 0.000 to km 40.700 in the state of odisha under nh(o) on hybrid annuity mode (package 1)
Read moreEngagement of user fee agency through e-tender at eight lane delhi-vadodara expressway from km 0.000 to km 228.748 on national highway no. ne-4 and kiranj fp for construction of six lane access controlled highway from dnd maharani bagh in haryana
Engagement of user fee agency through e-tender at eight lane delhi-vadodara expressway from km 0.000 to km 228.748 on national highway no. ne-4 and kiranj fp for construction of six lane access controlled highway from dnd maharani bagh in haryana
Read moreSecuring of row for four/six lane greenfield ludhiana rupnagar nh 205k from junction with ne5 near to manewal to junction with nh 205 near bheora village in the state of punjab on ham,pkg 2 ch 37.7 to ch 66.7 and spur from km 0.0 to km 18.5
Securing of row for four/six lane greenfield ludhiana rupnagar nh 205k from junction with ne5 near to manewal to junction with nh 205 near bheora village in the state of punjab on ham,pkg 2 ch 37.7 to ch 66.7 and spur from km 0.0 to km 18.5
Read moreof your Industry type