Tender Details
Particulars | Details |
---|---|
Title |
Proposed Crosspipe And Murrum Spreading Work In Required Places In Wn. 11 A Sangli.
|
Description |
Proposed Crosspipe And Murrum Spreading Work In Required Places In Wn. 11 A Sangli.
|
Organisation | Government of Maharashtra |
Tender Id | 2023_SMKMC_929976_40 |
Reference Number |
PWD_28_2023_2024 |
Tender Fee | 750 |
EMD | 7325 |
Tender Value | |
Place | SMKC PWD HEAD OFFICE E TENDER CELL |
Link | https://mahatenders.gov.in |
Start Date | July 29, 2023 14:30 |
End Date |
11/08/2023 ( Expired 649 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Hiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Hiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreConstruction and development work under cm infra phase 4 in raisen road work, building work, other component
Construction and development work under cm infra phase 4 in raisen road work, building work, other component
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreHiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Hiring of project management and technical consultancy (pmtc) for project implementation unit (piu) in sangli miraj kupwad municipal corporation (smkmc)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreDesign and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreof your Industry type