Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wb/Ae/Dnhsd/N Ie Q2/23 24
|
| Description |
Carrying Out Survey Work And Geometric Design For Improvement Of Alignment And Preparation Of Along Including Road Signages At Different Chainages Of Nh 55 (Location 20 Nos.), Along With Submission Of Road Safety Report From Chainage 0.00 Kmp. To 40.
|
| Organisation | PW(ROADS)(NH) | State Govt. and UT |
| Tender Id | 2023_NH_634182_1 |
|
Reference Number |
|
| Tender Fee | 0 |
| EMD | 20000 |
| Tender Value | 0 |
| Place | DARJEELING |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1359818 |
| Start Date | December 31, 2023 16:30 |
| End Date |
Expired
16/01/2024
Expired 885 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Carrying out survey work and geometric design for improvement of alignment and preparation of along including road sinages at different chainages of nh 55 location 20nos., along with submission of road safety report from chainage 40.00kmp to 77.00
Carrying out survey work and geometric design for improvement of alignment and preparation of along including road sinages at different chainages of nh 55 location 20nos., along with submission of road safety report from chainage 40.00kmp to 77.00
Read moreWb/ae/dnhsd/eniq2/23-24(2nd)
Carrying out survey work and geometric design for improvement of alignment and preparation of along including road signages at different chainages of nh-55 (location 20 nos.), along with submission of road safety report from chainage 0.00 kmp. to 40.
Read moreCarrying out survey work and geometric design for improvement of alignment and preparation of along including road sinages at different chainages of nh 55 in 10 nos location, along with submission of road safety report from chainage 40.00 kmp to 77.0
Refer to boq
Read moreCarrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md. bazar road from 0.00 kmp to 5.600 kmp under birbhum division, pwd
Carrying out falling weight deflectometer test and other necessary field works and calculations for preparation of detailed project report for the work of strengthening of suri md. bazar road from 0.00 kmp to 5.600 kmp under birbhum division, pwd
Read moreConsultancy services for carrying out topographical survey hydraulic analysis collection of data from irrigation department if required geotechnical investigation preparation of gad preparation of detailed project report detailed structural design an
Consultancy services for carrying out topographical survey hydraulic analysis collection of data from irrigation department if required geotechnical investigation preparation of gad preparation of detailed project report detailed structural design an
Read moreConsultancy services for carrying out road safety audit/nsv report/fwd report/traffic survey of various stretches of national highways in the state of arunachal pradesh.
Consultancy services for carrying out road safety audit/nsv report/fwd report/traffic survey of various stretches of national highways in the state of arunachal pradesh.
Read moreRoad safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh-7 (design chainage 501.930 to 531.330) and nepali farm-motichur nh-34 (design chainage 531.330-538.750) on epc mode in uttarakhand under nh(o)
Road safety improvement of existing four lane section of dehradun-lal tappar-nepali farm section of nh-7 (design chainage 501.930 to 531.330) and nepali farm-motichur nh-34 (design chainage 531.330-538.750) on epc mode in uttarakhand under nh(o)
Read moreCarrying out field survey silt data collection and analysis for preparation of detailed project report for bank protection work along the right bank of river dharalam singimari within jaridharala, daribosh and dhamaligachh area
Carrying out field survey silt data collection analysis for preparation of detailed project report for bank protection work along the right bank of river dharala singimari within jaridharala, daribosh and dhamaligachh area
Read moreCarrying out detailed engineering survey and preparation of dpr (detailed project report), for the construction of new underpass and fourlaning of road at ajani r.o.b. , taluka and distt. nagpur.
Carrying out detailed engineering survey and preparation of dpr (detailed project report), for the construction of new underpass and fourlaning of road at ajani r.o.b. , taluka and distt. nagpur.
Read moreConsultancy services for survey investigation and preparation of detailed project report and providing preconstruction services in respect of bishing tinali road indicative length 55 pt 400 green field alignment for constr and upgradatio
Consultancy services for survey investigation and preparation of detailed project report and providing preconstruction services in respect of bishing tinali road indicative length 55 pt 400 green field alignment for constr and upgradation
Read moreof your Industry type