Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Breather Assembly With Wire Mesh 🛠️ The Ministry Of Railways, Specifically The Central Government Ministry/Department, Is Seeking Bids For The Supply Of Breather Assemblies With Wire Mesh, Destined For Mumbai Cst. 🏭 🗓️ Deadline: August 1, 2024, 11:30 Am Bids Must Be Detailed, Including Technical Specifications, Pricing, And Delivery Schedules, In Accordance With The Tender Document For Complete Deion. Keywords: Breather Assembly, Wire Mesh, Ministry Of Railways, Mumbai Cst, Procurement, Government Tender| Particulars | Details |
|---|---|
| Title |
Breather Assembly With Wire Mesh For 10
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106385108 |
|
Reference Number |
48245775 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Mumbai CST |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106385108/viewNitPdf_4627077.pdf |
| Start Date | July 02, 2024 17:51 |
| End Date |
Expired
01/08/2024
Expired 783 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
E-tender for supply of 10 kl capacity of water tanker with sprinkler for subbarayanahalli and timmappangudi iron ore mines, sandur, bellary dist of ksmcl, bangalore, karnataka
E-tender for supply of 10 kl capacity of water tanker with sprinkler for subbarayanahalli and timmappangudi iron ore mines, sandur, bellary dist of ksmcl, bangalore, karnataka
Read moreHiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Hiring of 4.6 cum front end loader on hourly basis for handling coal with 24 hours availability for a period of 3 years with a minimum working hours of 350 hours per month at rchp, kgm area
Read moreCarry out routine maintenance with round the clock services for operation and maintenance of 33/11kv substation with connected distribution transformers and switchgear at head works and various intermediate pumping stations under srsp adilabad segment for the year 2026-27 for the period october 2026 to march 2027
Carry out routine maintenance with round the clock services for operation and maintenance of 33/11kv substation with connected distribution transformers and switchgear at head works and various intermediate pumping stations under srsp adilabad segment for the year 2026-27 for the period october 2026 to march 2027
Read moreHiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Hiring of 12nos of diesel operated generator sets 7.5kva,230v with mobile lighting towers for a period of 36 months for use at kocp,yellandu area.
Read moreThe external electrification with under ground cables for hmda layout at sy.nos. 39 and 40 bachupally (v), bachupally (m), medchal-malkajgiri (dist)
The external electrification with under ground cables for hmda layout at sy.nos. 39 and 40 bachupally (v), bachupally (m), medchal-malkajgiri (dist)
Read moreOperation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv )substations with distribution transformer (at various pumping stations) under narsapur segment, medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreOperation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Operation and maintenance of (33/11kv and 11kv ) substations with distribution transformer (at various pumping stations) under medak segment (08), medak division for fy 2026-27, (for the period from 01.10.2026 to 31.03.2027)
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreHiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Hiring of 2 nos. of diesel operated wheel mounted loaders with backhoe bucket (0.26 cu.m) and loading bucket (1.1 cu.m) for 36 months one at each section of pkoc, manuguru for improvement of quality of coal - reg.
Read moreof your Industry type