Tender Details

Particulars Details
Title
Bir Hisar , Hisar Ii , Const Of Water Storage Tank In Kabir Dharmshala (P. Samiti)
Description
Bir Hisar , Hisar Ii , Const Of Water Storage Tank In Kabir Dharmshala (P. Samiti)
Organisation Government of Haryana
Tender Id 2023_HRY_322416_1
Reference
Number
202310326CED A072 4EAC A39D 26DB43D192822012DEV
Tender Fee 500
EMD 4027
Tender Value
Place BDPO BLOCK HISAR-2
Link https://etenders.hry.nic.in
Start Date October 21, 2023 14:30
End Date

27/10/2023 ( Expired 565 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Read more
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)

Read more
Development, operation and maintenance of ropeway between tawang monastery to p t tso lake in tawang district in the state of arunachal pradesh on hybrid annuity mode.

Development, operation and maintenance of&#x0d ropeway between tawang monastery to p t&#x0d tso lake in tawang district in the state of&#x0d arunachal pradesh on hybrid annuity mode.

Read more
Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham

Const. of 6 lane zirakpur bypass starting from junc. with nh7 zirakpur patiala dc 0.000 and ending at junc. with nh5 zirakpur parwanoo dc 16.800 tl 19.200 km in punjab and haryana under nh(o) on ham

Read more
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode

Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode

Read more
Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii

Construction of common intake for jaipur, ajmer and tonk districts and laying of the raw water main pipeline under the bisalpur jaipur water supply project, stage-ii phase-ii&amp#x0d name of subwork- construction of 1000 mld intake pump house for jaipur an

Read more