Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work On Increasing The Capacity Of Transformers Under Edd Mehdawal
|
| Description |
Work On Increasing The Capacity Of Transformers Under Edd Mehdawal
|
| Organisation | Purvanchal Vidyut Vitran Nigam Limited Varanasi | State Govt. and UT |
| Tender Id | 2025_PVVNV_1068721_1 |
|
Reference Number |
16/EDC(SKN)/2025-26 |
| Tender Fee | 3540 |
| EMD | 21000 |
| Tender Value | - |
| Place | Santkabirnagar |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1949663 |
| Start Date | August 26, 2025 23:30 |
| End Date |
Expired
09/09/2025
Expired 380 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Development of the children park and lighting on model cheruvu in huzurabad municipality under nagarabhivruddi grants-2nd call
Development of the children park and lighting on model cheruvu in huzurabad municipality under nagarabhivruddi grants-2nd call
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConstruction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Construction work of a new office building at plot no.154 in r.s. no. 149/1,2a/1,2,5,6 within the limits of tmc annigeri.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreWork on increasing the capacity of transformers under edd-khalilabad
Work on increasing the capacity of transformers under edd-khalilabad
Read moreWork for increasing of medium capacity transformers under edd-i fatehpur
Work for increasing of medium capacity transformers under edd-i fatehpur
Read moreTo overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
To overcome the overloading of distribution transformers installed under executive engineer electricity distribution division, mehdawal, the work of increasing the capacity of transformers on semi-turnkey basis (under 20 crore work plan)
Read moreAfter increasing the capacity of distribution transformers, the work of replacing worn out abc conductors and increasing their capacity edd-kld
After increasing the capacity of distribution transformers, the work of replacing worn out abc conductors and increasing their capacity edd-kld
Read moreWork of increasing the capacity and installation of transformers under the business plan year 2024-25 phase-1 under electricity distribution division, mehdawal.
Work of increasing the capacity and installation of transformers under the business plan year 2024-25 phase-1 under electricity distribution division, mehdawal.
Read moreof your Industry type