Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road And Bridge Connecting Bypass Road In Kapre Estate Kanyashala Area In Mhasla Nagar Panchayat Tal. Mhasla Dist. Raigad
|
Description |
Construction Of Road And Bridge Connecting Bypass Road In Kapre Estate Kanyashala Area In Mhasla Nagar Panchayat Tal. Mhasla Dist. Raigad
|
Organisation | Directorate Of Municipal Administration | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2000 |
EMD | 40000 |
Tender Value | |
Place | Mhasla |
Link |
AAAAAAAAAA Login to view |
Start Date | April 16, 2025 16:30 |
End Date |
23/04/2025 ( 2 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreConstruction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreConsultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Consultancy services for preparation of dpr and land acquisition of bhokar city bypass road on nh61 connecting to nh161a km 0.00 to km 5.00 in bhokar taluka district nanded in the state of maharashtra on epc mode length 5.00 km
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreReplacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Replacement of 6 nos. existing narrow-poor minor bridge-culvert by suitable waterways structure with provision of temp. di etc. and raising of embankment ... in between km 610.00 to km 626.00 of nh-31 i the dist. of jalpaiguri, job no.566.
Read moreConstruction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreDesign and construction of underground stations at market yard, padmavati , katraj stations & associated tunnels in stage-i and stations at bibwewadi & balaji nagar in stage-ii swargate-katraj section of pune metro rail project
Design and construction of underground stations at market yard, padmavati , katraj stations & associated tunnels in stage-i and stations at bibwewadi & balaji nagar in stage-ii swargate-katraj section of pune metro rail project
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of road and drain at palod colony in bhama ward, nagar palika parishad, gadarwara
Construction of road and drain at palod colony in bhama ward, nagar palika parishad, gadarwara
Read moreConstruction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Construction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Read moreof your Industry type