Tender Details
Particulars | Details |
---|---|
Title |
Prize Money For Winner Team,Prize Money For Runner Up Team,Trophy For Winner Team,Trophy For Runner
|
Description |
|
Organisation | Department of Military Affairs | Ministry of Defence |
Tender Id | GEM/2024/B/5761358 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | January 06, 2025 16:33 |
End Date |
27/01/2025 ( Expired 126 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Consultancy service for authority engineer for supervision of up-gradation to two lane with paved shoulder from design chainage km. 118.813 to km. 148.810 and km. 155 to km. 165.082 of nh-351 in the state of gujarat
Read moreProviding, running and maintenance of commercial vehicle innova hycross model or equivalent and scorpio-n model or equivalent for regional office-up west lucknow, uttar pradesh 5th call
Providing, running and maintenance of commercial vehicle innova hycross model or equivalent and scorpio-n model or equivalent for regional office-up west lucknow, uttar pradesh 5th call
Read moreTariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Tariff based competitive bidding (tbcb) for setting up of new 1100 mw lignite-based thermal power project under dbfoo along with revival of existing 2x125 mw giral lignite thermal project of rvunl in barmer district- rajasthan
Read moreSelection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreMaintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre
Read moreAllotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Allotment of water area and appurtenant land for setting up and operation of floating lng terminal consisting of a fsru or fsu with land based regasification under policy guidelines for land management-2014 as modified 2015 and all its clarifications
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreWinner trophy big,runner up trophy big,best player trophy,best goal keeper trophy,participation cer
Read more
Setting up a 75 mtpd material recovery facility along with its operation and maintenance for a period of 7 plus 3 years at keshavnagar, mundhwa, pune
Setting up a 75 mtpd material recovery facility along with its operation and maintenance for a period of 7 plus 3 years at keshavnagar, mundhwa, pune
Read moreof your Industry type