Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 110k V Line Between Location 10 15 Of Azhikode Lilo Feeder In Connection With The Construction Of Nh 66, For Maintaining Statutory Clearance
|
| Description |
Shifting Of 110k V Line Between Location 10 15 Of Azhikode Lilo Feeder In Connection With The Construction Of Nh 66, For Maintaining Statutory Clearance
|
| Organisation | Kerala State Electricity Board | State Govt. and UT |
| Tender Id | 2024_KSEB_686501_1 |
|
Reference Number |
EE/TD/ KSGD/02/2024-25 dated 17/08/2024 |
| Tender Fee | 5900 |
| EMD | 50000 |
| Tender Value | |
| Place | Valapattanam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1068205 |
| Start Date | August 20, 2024 15:30 |
| End Date |
Expired
02/09/2024
Expired 658 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.
Read moreLine extension-oyec for new jbic 11kv feeder in favour of the executive engineer(cw-6716-202526-21) under electrical section , chakkittapara in electrical sub division perambra.
Line extension-oyec for new jbic 11kv feeder in favour of the executive engineer(cw-6716-202526-21) under electrical section , chakkittapara in electrical sub division perambra.
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreTransmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)
Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired
Read moreDharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g 1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitatio
Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g p1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitation camp2025-2026 pappi
Read moreShifting of 110kv line between location 10-15 of azhikode lilo feeder in connection with the construction of nh-66, for maintaining statutory clearance
Shifting of 110kv line between location 10-15 of azhikode lilo feeder in connection with the construction of nh-66, for maintaining statutory clearance
Read moreof your Industry type