Tender Details

Particulars Details
Title
Shifting Of 110k V Line Between Location 10 15 Of Azhikode Lilo Feeder In Connection With The Construction Of Nh 66, For Maintaining Statutory Clearance
Description
Shifting Of 110k V Line Between Location 10 15 Of Azhikode Lilo Feeder In Connection With The Construction Of Nh 66, For Maintaining Statutory Clearance
Organisation Kerala State Electricity Board | State Govt. and UT
Tender Id 2024_KSEB_686501_1
Reference
Number
EE/TD/ KSGD/02/2024-25 dated 17/08/2024
Tender Fee 5900
EMD 50000
Tender Value
Place Valapattanam
Link
View Original Tender Notice

https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1068205

Start Date August 20, 2024 15:30
End Date
Expired 02/09/2024

Expired 658 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Construction of road protection measures from km.110-000 to km.176-000 (section between mokhada to jawhar) on nh-160a in the state of maharashtra. on epc mode.

Read more
Line extension-oyec for new jbic 11kv feeder in favour of the executive engineer(cw-6716-202526-21) under electrical section , chakkittapara in electrical sub division perambra.

Line extension-oyec for new jbic 11kv feeder in favour of the executive engineer(cw-6716-202526-21) under electrical section , chakkittapara in electrical sub division perambra.

Read more
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)

Transmission line package tl01 associated with di of 765 kv d/c dharamjaygarh-jabalpur ckt i and ii transmission line coming in submergence area of proposed construction of raghavpur multipurpose project in the state of mp by narmada valley development authority (nvda)

Read more
Dharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gplus 1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabili

Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 81 to 160 houses (8 houses (gpl1) -10 units - centre) including the leveling of site. pkg.no. tn04-02 / srilankan rehabilitation 2025-2026 pappired

Read more
Dharmapuri district - construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g 1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitatio

Construction of houses for srilankan rehabilitation camp in vanniyar dam of pappireddipatti block - 1 to 80 houses (8 houses (g p1) -10 units - nw side) including the leveling of site pkg.no. tn04-01 / srilankan rehabilitation camp2025-2026 pappi

Read more
Shifting of 110kv line between location 10-15 of azhikode lilo feeder in connection with the construction of nh-66, for maintaining statutory clearance

Shifting of 110kv line between location 10-15 of azhikode lilo feeder in connection with the construction of nh-66, for maintaining statutory clearance

Read more
Click Here to Download Dockets
of your Industry type