Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
The Work Of Conveyor Belt Jointing, Patching, Rubber Lining And Lagging Works Of Different Size Of Pulleys And Drums Of Chp, Obra.
|
| Description |
The Work Of Conveyor Belt Jointing, Patching, Rubber Lining And Lagging Works Of Different Size Of Pulleys And Drums Of Chp, Obra.
|
| Organisation | UP Rajya Vidyut Utpadan Nigam Ltd | State Govt. and UT |
| Tender Id | 2025_RVUNL_1025498_1 |
|
Reference Number |
6000007612/T-01/2024-25 |
| Tender Fee | 1180 |
| EMD | 50500 |
| Tender Value | - |
| Place | Obra Thermal Power Station |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1852766 |
| Start Date | April 07, 2025 14:30 |
| End Date |
Expired
06/05/2025
Expired 529 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Echp-ii-providing rubber lagging of various pulleys in conveyor belts
Echp-ii-providing rubber lagging of various pulleys in conveyor belts
Read moreConveyor pulleys rubber lagging work by cold vulcanizing at chipper house at tnpl unit - ii trichy
Conveyor pulleys rubber lagging work by cold vulcanizing at chipper house at tnpl unit - ii
Read moreIchp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Read moreSupply of spare ht motors for compressor motor chp conveyor belt motors as per boq-tds
Supply of spare ht motors for compressor motor chp conveyor belt motors as per boq-tds
Read moreRepairing of structural support by supply and fixing of plane sheet of conveyor belt c-14 reclaim section at rajmahal chp.
Repairing of structural support by supply and fixing of plane sheet of conveyor belt c-14 reclaim section at rajmahal chp.
Read moreSupply, installation, and commissioning of 1 no. 10-meter length and 1-meter width of 8mm belt thickness with 3 ply conveyor belt operated by 1.5 hp geared 3 phase motor with suitable stands, supports and pulleys
Supply, installation, and commissioning of 1 no. 10-meter length and 1-meter width of 8mm belt thickness with 3 ply conveyor belt operated by 1.5 hp geared 3 phase motor with suitable stands, supports and pulleys
Read moreProcurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Procurement of conveyor pulley lagging sheets, wagon tippler clamp pad, wagon tippler side beam wear pad, cushioning pad for side arm charger and duel lip sealing system rubber block with clamp plate for chp-i, 2x600mw, and chp-ii, 2x660mw, sstpp.
Read moreBiennial rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor belt 6a/b/c and s/r-1/2/3 at chp, ktps under chp(o).
Biennial rate contract for coal cleaning and housekeeping at all routes of post crusher zone under conveyor belt 6a/b/c and s/r-1/2/3 at chp, ktps under chp(o).
Read moreRepair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Repair and replacement of the damaged cable tray along with cover to ensure protection of the cables from damages, equipped for conveyor belt no. 1019 and 1018 under chp-cpp, ppr.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreof your Industry type