Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of 16 (Sixteen) Nos. Motor Dala For 11 Kw, 18.5 Kw, 8.5 Kw, 22 Kw And 30 Kw Of Different Make Motor At Moonidih Coal Washery.
|
| Description |
Repairing Of 16 (Sixteen) Nos. Motor Dala For 11 Kw, 18.5 Kw, 8.5 Kw, 22 Kw And 30 Kw Of Different Make Motor At Moonidih Coal Washery.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_285825_1 |
|
Reference Number |
BCCL/PO/MND/EnM/E -Tender/2023-24/E 556 |
| Tender Fee | - |
| EMD | 6900 |
| Tender Value | - |
| Place | OFFICE OF THE PROJECT OFFICER MOONIDIH WASHERY |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | August 12, 2023 14:30 |
| End Date |
Expired
21/08/2023
Expired 1154 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of 3 phase 25 hp/18.5 kw squirrel cage induction motor as per annexure a attached.
Supply of 3 phase 25 hp/18.5 kw squirrel cage induction motor as per annexure a attached.
Read more3 phase submersible pump-motor sets, motor capacity 40hp/30 kw and pump capacity 14500 gph
3 phase submersible pump-motor sets, motor capacity 40hp/30 kw and pump capacity 14500 gph
Read moreMechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Mechanical repairing/ overhauling of gear box and gear coupling including fabrication and installation of gear box and motor base frame of conveyor unit 401 at moonidih coal washery.
Read moreTtps operation circle o e ii fps replacement of failed bed frame of jockey pump motor set i and ii of capacity 18.5 kw, 30m3 hr, head 70mwc at rwph
Ttps operation circle o e ii fps replacement of failed bed frame of jockey pump motor set i and ii of capacity 18.5 kw, 30m3 hr, head 70mwc at rwph
Read moreThe work for 22 kw new connection at tilmapur nalkup no-01 and nalkup no- 02 zone-05, 30 kw new connection of mahaprabandhak jalkal vibhag sarnath cwr in the side wtp plant, 8 kw new connection at rajnahiya nalkup no-01 and 18 kw new connection at
The work for 22 kw new connection at tilmapur nalkup no-01 and nalkup no- 02 zone-05, 30 kw new connection of mahaprabandhak jalkal vibhag sarnath cwr in the side wtp plant, 8 kw new connection at rajnahiya nalkup no-01 and 18 kw new connection at
Read more30 kw motor for oil cooling unit (centrifugal design) for 3-phase loco to rdso spec. no. e-10/3/09(motor) of august 1997 with amendment slip no. 1 to 6.
30 kw motor for oil cooling unit (centrifugal design) for 3-phase loco to rdso spec. no. e-10/3/09(motor) of august 1997 with amendment slip no. 1 to 6.
Read moreof your Industry type