Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Bm Unit I Aoh 2025 26 Renewal Reconditioning Of Various Saw Tooth Expansion Joints In Fg Ducts And Air Ducts And Other Related Works Etc In Both A And B Sides
|
| Description |
Mtps I Bm Unit I Aoh 2025 26 Renewal Reconditioning Of Various Saw Tooth Expansion Joints In Fg Ducts And Air Ducts And Other Related Works Etc In Both A And B Sides
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_562227_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.110/ 2025-26 |
| Tender Fee | 0 |
| EMD | 5000 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=671356 |
| Start Date | May 27, 2025 23:30 |
| End Date |
Expired
10/06/2025
Expired 491 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of saw tooth expansion joints for hot air duct of xrp803 bowl mills style i and iii 2items
Procurement of saw tooth expansion joints for hot air duct of xrp803 bowl mills style i and iii 2items
Read moreTtps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air
Ttps operation circle mpm i unit iii overhauling and reconditioning of hot and cold air dampers, gates, ducts, replacement of expansion joints, seal air fan and cleaning of accumulated fly ash deposited inside the horizontal portion of the hot air
Read moreMtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Mtps i bm unit ii boiler aoh 2026 reconditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied works
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective boiler tubes in 9th header and economizer coils at boiler iind pass area and radiography testing of welded joints
Read moreMtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Mtps i mill plant unit ii dismantling of existing elliptical feeder discharge chutes in mill 2c 2d reconditioning of released ss elliptical feeder discharge chutes and reassembling the same during aoh 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Mtps i bm unit ii boiler pressure parts aoh 2026 reconditioning and hard facing of used and worn out square coal nozzle tips including ss309 plates and checking of deformation and matching with nozzle
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i bm unit i aoh 2024 25 renewal reconditioning of various saw tooth expansion joints in fg ducts air ducts and other related works etc in both a and b sides
Mtps i bm unit i aoh 2024 25 renewal reconditioning of various saw tooth expansion joints in fg ducts air ducts and other related works etc in both a and b sides
Read moreof your Industry type