Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Automatic Telephone Exchange Panel Works On Mfv Mastya Drushti
|
Description |
Automatic Telephone Exchange Panel Works On Mfv Mastya Drushti
|
Organisation | Hindustan Shipyard Limited | Public Sector Undertakings |
Tender Id | 2025_HSL_97015_1 |
Reference Number |
20 / 22028 / 166 / Automatic Telephone Exchange / 2024-25 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | HSL Visakhapatnam |
Link | eprocurehslgsl.nic.in?page=FrontEndTenderDetailsExternal&service=page&tnid=106523 |
Start Date | March 28, 2025 22:30 |
End Date |
22/04/2025 ( Expired 54 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreSelection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years
Selection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years
Read moreConstruction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Construction of 2x500 mva, 400/220 kv sub-station at amber (jaipur-north) (distt.jaipur) including supply of all equipments/materials, erection (including civil works), testing and commissioning (on turnkey basis) against specification no. rvpn/ehv/b
Read morePackage 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Package 20c design, engineering, supply,installation, testing, commissioning and comprehensive operation and maintenance of 3.0 mwp roof top solar pv project and associated support structure works on resco model for a period of 25 years.
Read moreSupply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Supply installation commissioning and maintaining 02 units of fully automatic biochemistry analyzers on reagent rental basis for dept of biochemistry at aiims bhubaneswar for a period of five years from letter of award
Read moreNit for supply installation and commissioning of 100 l and 500 l biofermentrers with single control panel to fuilly automatic control of both 02 nos biofermenters
Supply installation and commissioning of 100 l and 500 l biofermentrers with single control panel to fuily automatic control of both 02 nos biofermenters
Read moreMaintenance works to be taken up on risk and cost of the concessionaire contractor
Maintenance works to be taken up on risk and cost of the concessionaire contractor
Read moreO and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
Read moreRepair maint to electric distribution system including feeder pillar box busbar lt panel flood lights and allied works and improvement of lt oh line lt ug cables including service connections and connected items at mffr under age i mffr
Repair maint to electric distribution system including feeder pillar box busbar lt panel flood lights and allied works and improvement of lt oh line lt ug cables including service connections and connected items at mffr under age i mffr
Read moreof your Industry type