Tender Details

About Tender

🏭 Procurement Notice: Refurbishment Of Valves For Sgtpp 🛠️ The West Bengal Power Development Corporation Ltd., On Behalf Of The State Government And Union Territories, Is Seeking Bids For The Refurbishment Of The Start Up Vent (Cbd Ebd) And A High Pressure (Hp) Globe Valve Class 2680. This Project Is Critical For The Overhauling Of Unit 2, Stage 1, Of The 2x300 Mw Sgtpp, Scheduled For July 2024. 📅 Bid Submission Deadline: June 22, 2024, 10:00 Am The Tender Fee Is Inr 10,570. Interested Bidders Must Submit Detailed Proposals, Including Technical Specifications, Pricing, And A Demonstrable Track Record Of Similar Refurbishment Work. Location: Adbuilding, Sgtpp, P.O. Manigram, Dist. Murshidabad. Keywords: Refurbishment, Valves, Power Development, Sgtpp, Wbpdcl, State Govt. And Ut, Tender, Bid Submission, High Pressure Globe Valve, Cbd Ebd Start Up Vent
Particulars Details
Title
Refurbishment Of Cbd Ebd Start Up Vent And Manual Operated Hp Globe Valve Class 2680 For Overhauling Of Unit 2 Stage 1 2x300mw Sgtpp Scheduled In July2024
Description
Refurbishment Of Cbd Ebd Start Up Vent And Manual Operated Hp Globe Valve Class 2680 For Overhauling Of Unit 2 Stage 1 2x300mw Sgtpp Scheduled In July2024
Organisation THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT
Tender Id 2024_WBPDC_689580_1
Reference
Number
WBPDCL/SGTPP/NIT/E2892/23-24
Tender Fee 0
EMD 10570
Tender Value
Place Adbuilding SGTPP P.O Manigram Dist Murshidabad
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1501948
Start Date June 06, 2024 15:30
End Date

22/06/2024 ( Expired 374 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Procurement of re-heater tubes for overhauling of unit-1 scheduled in september 2025, stage-i, sgtpp.

Procurement of re-heater tubes for overhauling of unit-1 scheduled in september 2025, stage-i, sgtpp.

Read more
Procurement of different types of spares of vibrating feeder of unit-1 overhauling scheduled in august-2025, stage-1(2x300 mw).

Procurement of different types of spares of vibrating feeder of unit-1 overhauling scheduled in august-2025, stage-1(2x300 mw).

Read more
Procurement of different types of gland packing for hp valves for unit 1 and 2 boiler, stage 1, sgtpp.

Procurement of different types of gland packing for hp valves for unit 1 and 2 boiler, stage 1, sgtpp.

Read more
Procurement of spares for bhel kwu hp turbine modules installed in unit no. 1 and 2 at 2x600mw at sstpp, mppgcl, dongalia.

Procurement of spares for bhel kwu hp turbine modules installed in unit no. 1 and 2 at 2x600mw at sstpp, mppgcl, dongalia.

Read more
Procurement of spares for complete coal nozzle assembly for unit 2 overhauling scheduled in july 2026.

Procurement of spares for complete coal nozzle assembly for unit 2 overhauling scheduled in july 2026.

Read more
Ktps-v-tm-supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.

Ktps-v-tm- supervisory charges for 2 no of service engineers for overhauling of hp bypass main valves(bp1 and bp2) (model:ars100), hp bypass spray valves(bpe1,bpe2 and bd) (model:e32s) and hp bypass oil supply units (model:ov 32 b) in unit-ix during aoh 2025-26.-reg.

Read more
Procurement of non-metallic bellow used in esp outlet duct at boiler for unit-1 and 2,sgtpp.

Procurement of non-metallic bellow used in esp outlet duct at boiler for unit-1 and 2,sgtpp.

Read more
Annual contract for routine breakdown and capital maintenance works of lt switchgear lt motors and electrical operated motorized valve dampers and soot blowers etc and its associated equipments or works for unit 1 and 2 katpp jhalawar

Annual contract for routine breakdown and capital maintenance works of lt switchgear lt motors and electrical operated motorized valve dampers and soot blowers etc and its associated equipments or works for unit 1 and 2 katpp jhalawar

Read more
Overhauling of pa fan 1a and 1b and fd fan 1a and 1b during unit 1 overhauling scheduled to be held in august 2025 2x300mw sgtpp

Overhauling of pa fan 1a and 1b and fd fan 1a and 1b during unit 1 overhauling scheduled to be held in august 2025 2x300mw sgtpp

Read more
High pressure water jet cleaning of condenser tubes and lube oil cooler tubes 2 sets in coming overhauling of unit 1 at stg i sgtpp during aug 2025 sgtpp

High pressure water jet cleaning of condenser tubes and lube oil cooler tubes 2 sets in coming overhauling of unit 1 at stg i sgtpp during aug 2025 sgtpp

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise