Tender Details

Particulars Details
Title
Pddss2526100871 Electrification Of Gram Panchayat (List Enclosed) Under The Bharat Net Phase 3 Project Under Ut Capex
Description
Pddss2526100871 Electrification Of Gram Panchayat (List Enclosed) Under The Bharat Net Phase 3 Project Under Ut Capex
Organisation DC-PDD | CE-M and RE Wing Kashmir | South Bijbehara | ED-Anantnag
Tender Id Login to view
Reference
Number
Login to view
Tender Fee 1000
EMD 46080
Tender Value 23.04 Lakh
Place Jammu and Kashmir
Link Login to view
Start Date September 22, 2026 21:30
End Date
Closing soon 13/10/2026

0 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Electrification of gram panchayat under baharat net ( new un-electrified sites) under ut capex

Electrification of gram panchayat under baharat net ( new un-electrified sites) under ut capex

Read more
Development of electrical infrastructure of electrification of gram panchayats under the bharat net phase- 3 project

Development of electrical infrastructure of electrification of gram panchayats under the bharat net phase- 3 project

Read more
Improvement/stabilization of ht/lt network as per the enclosed work list (2 works) under district capex for the year 2026-27 -pri grants (sub division dooru)

Improvement/stabilization of ht/lt network as per the enclosed work list (2 works) under district capex for the year 2026-27 -pri grants (sub division dooru)

Read more
Replacement of worn-out conductors and rotten poles at various locations falling under the jurisdiction of ed anantnag with work code (pddss2627100228) (under ut capex) (works list enclosed)

Replacement of worn-out conductors and rotten poles at various locations falling under the jurisdiction of ed anantnag with work code (pddss2627100228) (under ut capex) (works list enclosed)

Read more
External electrification work in indira market phase 3

External electrification work in indira market phase 3

Read more
External electrification work of industrial area agar malwa phase 3

External electrification work of industrial area agar malwa phase 3

Read more
As per the requirement of council time to time supply of different water supply materials on annual basis list enclosed with this nit

As per the requirement of council time to time supply of different water supply materials on annual basis list enclosed with this nit

Read more
Deposit-govt ayurveda college pariyaram animal house 2nd phase-electrification general electrical work

Deposit-govt ayurveda college pariyaram animal house 2nd phase-electrification general electrical work

Read more
Annual plan-three phase electrification of mcf punnapra ,- under punnapra sgp.-general electrical work

Annual plan-three phase electrification of mcf punnapra ,- under punnapra sgp.-general electrical work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise