Tender Details
Particulars | Details |
---|---|
Title |
Strengthening &Amp Stabilization Of Bank Slip In Bdwa Ggt Section Between Km 922 926 Of Bridges 128 To 132 With Provision Of Drain Cum Toe Wall, Gabion Structure With Crate &Amp Boulders, Provision Of Geosynthetic, Cess Repair, Retaining Wall Etc Under The Jurisdiction Of Sr.Den/North.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79629124 |
Reference Number |
DRM-ENGG-BSP-T-140-24-25 |
Tender Fee | 0 |
EMD | 10.66 Lakh |
Tender Value | |
Place | Bilaspur |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79629124/viewNitPdf_4838495.pdf |
Start Date | January 24, 2025 23:19 |
End Date |
24/02/2025 ( Expired 81 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening & stabilization of bank slip in bdwa-ggt section between km 922-926 of bridges 128 to 132 with provision of drain cum toe wall, gabion structure with crate & boulders, provision of geosynthetic, cess repair, retaining wall etc under the jurisdiction of sr.den/north.
For complete deion and other details, please refer to tender
Read moreConstruction of inspection pathway on 6 nos major bridges, height gauge, drain work, boulder wall, toe wall and other associated misc works in between kheraund and jharahi section in connection with new bg line between tilaiya to koderma under jurisdiction of dy. ce/construction/dhanbad in east central railway of dhanbad division.
For complete deion and other details, please refer to tender
Read more(1) provision of grouting at seepage, repair of road surface improvement to drains system, dewatering at lhs no.235,282 & 308 etc in between nir-cwa(bg) section under the jurisdiction of aden/chhindwara & (2) improvement to toe wall, ballast retainer, cess improvement, cement grouting etc of orn-3 & 4 bridges under aden/chhindwara.
For complete deion and other details, please refer to tender
Read moreProposed repairs to cess such as widening of bank, easening side slope, making trolley refuges in diffrent patches and along with provision of toe wall of flyover line in between km.173 to km.181 of jkpr-sknd section under jurisdication of aden/jjkr of khurda road division.
For complete deion and other details, please refer to tender
Read moreEarth work in bank/cutting including blanketing, construction of minor bridges, rub/lhs, fob, trolley refuges, toe wall, retaining wall, pitching, station buildings and other structures, platform, platform sheds, staff quarters and other ancillary works from singawal (excluding) to railaroad (including) between km 53/3 to km 99/0 in connection with doubling of ajmer-chanderiya in ajmer division of north western railway.
For complete deion and other details, please refer to tender
Read moreEarth work in bank/cutting including blanketing, construction of minor bridges, rub/lhs, fob, trolley refuges, toe wall, retaining wall, pitching, station buildings and other structures, platform, platform sheds, staff quarters and other ancillary works from adarsh nagar(including) to singawal (including) between km 4/6 to 53/3 in connection with doubling of ajmer-chanderiya in ajmer division of north western railway.
For complete deion and other details, please refer to tender
Read more(1) provision of grouting at seepage, repair of road surface improvement to drains system, dewatering at lhs no.235,282 & 308 etc in between nir-cwa(bg) section under the jurisdiction of aden/chhindwara & (2) improvement to toe wall, ballast retainer, cess improvement, cement grouting etc of orn-3 & 4 bridges under aden/chhindwara.
For complete deion and other details, please refer to tender
Read moreElectrical trd portion of work in connection with 1) elimination of lc no.19 at km 271/3-4 between dd-brb station by providing rub of size 6.0 x 5.15 by pushing technique in dd-sur section 2) elimination of lc no.41 at km 390/1-2 between wds-ma station by providing rub of size 6.0 x 5.15 by pushing technique in dd-sur section 3) provision of additional rub at location 409/2-3 by pushing method in kwv-lur section 4) provision of gabion wall, ballast retaining wall, toe wall, protection work etc
For complete deion and other details, please refer to tender
Read moreKjt-lnl:- proposed stabilization of bank slope by providing rcc retaining wall at km 106/700-900 on mid line along with earthwork in embankment and provision of drain between up and mid lines to divert water to nearby bridge to pr ingress of water in the embankment between pdi-jbc in se ghat section.
For complete deion and other details, please refer to tender
Read moreKjt-lnl : stabilization of bank slope by providing rcc toe wall at km 103/100-700 on dn line along with strengthening of br. no. 103/1 by jacketing and increasing its barrel length & jacketing of wing wall of br. no. 103/2 and repairing its scoured flooring on downstream side between pdi-jbc in se ghat section.
For complete deion and other details, please refer to tender
Read moreof your Industry type