Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
P/F Aluminium Partition, Tiles Flooring, False Ceiling, Upvc And Painting Work In Lab And Cabin Of Dr. Abir Ghosh (On First Floor) Dept. Of Chemical Engg. In Iit(bhu), Varanasi
|
Description |
P/F Aluminium Partition, Tiles Flooring, False Ceiling, Upvc And Painting Work In Lab And Cabin Of Dr. Abir Ghosh (On First Floor) Dept. Of Chemical Engg. In Iit(bhu), Varanasi
|
Organisation | Indian Institute of Technology(BHU) Varanasi | Central Govt. Ministry/Department |
Tender Id | 2024_IITBU_833154_1 |
Reference Number |
IIT(BHU)/IWD/CT44/2024-25/1578 |
Tender Fee | 1180 |
EMD | 15500 |
Tender Value | |
Place | Institute Works Department, |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=885476 |
Start Date | January 02, 2025 21:30 |
End Date |
23/01/2025 ( Expired 158 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Renovation of m.sc. and b.tech. (i and ii) lab, p/f of upvc in ventilation, renovation of labs, toilet and waterproofing of roof in dept. of chemistry, iit(bhu), varanasi.
Renovation of m.sc. and b.tech. (i and ii) lab, p/f of upvc in ventilation, renovation of labs, toilet and waterproofing of roof in dept. of chemistry, iit(bhu), varanasi.
Read moreRenovation and retrofitting of toilet block, p/f door, and fittings, mosquito net and painting work in asn bose, s. ramanujan hostel, gsmc old and extension, nivedita, visveswaraya, iit(bhu), varanasi
Renovation and retrofitting of toilet block, p/f door, and fittings, mosquito net and painting work in asn bose, s. ramanujan hostel, gsmc old and extension, nivedita, visveswaraya, iit(bhu), varanasi
Read moreElectrical installation, wiring, illumination, power point, light and fan point works in the rapid solidification lab, welding lab, mmd division and lt-1 of dept. of metallurgical engg., iit(bhu), varanasi
Electrical installation, wiring, illumination, power point, light and fan point works in the rapid solidification lab, welding lab, mmd division and lt-1 of dept. of metallurgical engg., iit(bhu), varanasi
Read moreProviding and fixing of false ceiling, aluminium partition works in precision engineering hub, iit bhu, varanasi.
Providing and fixing of false ceiling, aluminium partition works in precision engineering hub, iit bhu, varanasi.
Read moreElectrical installation, wiring, illumination, power point, light and fan point works in room-43 and lab-18 (machine room) in the dept. of pharmaceutical engg., iit(bhu), varanasi.
Electrical installation, wiring, illumination, power point, light and fan point works in room-43 and lab-18 (machine room) in the dept. of pharmaceutical engg., iit(bhu), varanasi.
Read moreElectrical renovation, installation, rewiring, illumination, power point, light and fan point works in gopal tripathi auditorium, dept. of chemical engg., iit(bhu), varanasi
Electrical renovation, installation, rewiring, illumination, power point, light and fan point works in gopal tripathi auditorium, dept. of chemical engg., iit(bhu), varanasi
Read moreProvision of aluminium partition, false ceiling and wall panelling in e-10 b building at first floor, for use of drat at civil line, prayagraj
Provision of aluminium partition, false ceiling and wall panelling in e-10 b building at first floor, for use of drat at civil line, prayagraj
Read moreElectrical installation, wiring, illumination, power point, light and fan point works in the pg research lab, room no.69 ground floor, ml shroff block in pharmaceutical engg., dept., iit(bhu), varanasi
Electrical installation, wiring, illumination, power point, light and fan point works in the pg research lab, room no.69 ground floor, ml shroff block in pharmaceutical engg., dept., iit(bhu), varanasi
Read moreSitc of electrical installation, wiring, illumination, cabeling, power point, light and fan point works in behavioural research lab of dr. vinod tiwari, department of pharmaceutical engg. department, iit(bhu) varanasi
Sitc of electrical installation, wiring, illumination, cabeling, power point, light and fan point works in behavioural research lab of dr. vinod tiwari, department of pharmaceutical engg. department, iit(bhu) varanasi
Read moreConstruction of new platform with granite, plumbering, door, making wood shelve, false ceiling, aluminium partition (cabin), painting works in dept. of chemistry, repair of toilet t-15 grta and various civil work in ceramic and mining dept., iit(bhu)
Construction of new platform with granite, plumbering, door, making wood shelve, false ceiling, aluminium partition (cabin), painting works in dept. of chemistry, repair of toilet t-15 grta and various civil work in ceramic and mining dept., iit(bhu)
Read moreof your Industry type