Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairing Of 16 Nos. Of Sheave Pulleys For Various Conveyors Of Phase Ii Nigahi Chp.
|
| Description |
Repairing Of 16 Nos. Of Sheave Pulleys For Various Conveyors Of Phase Ii Nigahi Chp.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_NCL_293373_1 |
|
Reference Number |
NGH/EM/e-Tender/23-24/26 dtd.10.11.2023 |
| Tender Fee | - |
| EMD | 2300 |
| Tender Value | - |
| Place | Office of GM EM Nigahi |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 11, 2023 16:30 |
| End Date |
Expired
25/11/2023
Expired 1058 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of impact idlers for chp conveyors
Procurement of impact idlers for chp conveyors for 1000 mt capacity (2 x 270 mw units)
Read moreIchp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Ichp-provision of rubber lagging over the pulleys in 1400mm and 1800mm belt width conveyors in ichp stage-iii conveyors
Read moreBelt monitoring system for critical conveyors of chp unit1&2.
Supply, erection & commissioning of belt monitoring system for critical conveyors of chp.
Read moreRepairing/overhauling of primary gyratory crusher kb 63-75 installed at central chp, nigahi project
Repairing/overhauling of primary gyratory crusher kb 63-75 installed at central chp, nigahi project
Read moreProcurement of taper lock bush pulleys for various equipment working in tmd and chp at stpp, jaipur, mancherial, telangana.
Procurement of taper lock bush pulleys for various equipment working in tmd and chp at stpp, jaipur, mancherial, telangana.
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreProviding lan connectivity at manual coal sampling point, automatic mechanised sampler(ams) of chp phase 2nd and phase 3rd for integration with iccc control room at khadia project
Providing lan connectivity at manual coal sampling point, automatic mechanised sampler(ams) of chp phase 2nd and phase 3rd for integration with iccc control room at khadia project
Read moreRepairing of 2 no. hydraulic pumps (type- a4vg90ep4d1) of rexroth make installed in plough feeder assemblies of chp phase-i, amlohri project.
Repairing of 2 no. hydraulic pumps (type- a4vg90ep4d1) of rexroth make installed in plough feeder assemblies of chp phase-i, amlohri project.
Read moreSupply, installation, and commissioning of 1 no. 10-meter length and 1-meter width of 8mm belt thickness with 3 ply conveyor belt operated by 1.5 hp geared 3 phase motor with suitable stands, supports and pulleys
Supply, installation, and commissioning of 1 no. 10-meter length and 1-meter width of 8mm belt thickness with 3 ply conveyor belt operated by 1.5 hp geared 3 phase motor with suitable stands, supports and pulleys
Read moreAc circuit breaker 50a, 3 pole d curve (type-16) with aux. contacts 02 nos. for three phase electric locomotive.
Ac circuit breaker 50a, 3 pole d curve (type-16) with aux. contacts 02 nos. for three phase electric locomotive.
Read moreof your Industry type