Tender Details

Particulars Details
Title
Dismantling Of Pipeline 80 Mm,Dismantling Of Pipeline 100 Mm,Erection Of Steel Scaffolding,1 Inch Ss
Description
Organisation NA | Ministry of Petroleum and Natural Gas
Tender Id GEM/2024/B/5674719
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date December 07, 2024 18:29
End Date
Expired 17/12/2024

Expired 535 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Tender Result
Tender Status: Active
Additional Information: Average Turn Over of Last 3 Years: 11 Lakhs Experience with Gov. Required: Years
Buyer Details
Name: M P Vigneshwaran
Address: M P Vigneshwaran,[email protected],HPCL, Madurai-IRD PLOT 167-172, SOUTH PHASE SIDCO INDUSTRIAL ESTATE KAPPALUR MADURAI - 625008,Madurai,TAMIL NADU,625008,India,-8825410784-
Ministry: Ministry Of Petroleum And Natural Gas
Department: Na
Organisation: Hindustan Petroleum Corporation Ltd
Office Address: Petroleum House
Similar Tenders
Fabrication, erection and dismantling of damaged structurals in hardwood and chipper house in pulp mill mechanical at tnpl unit-1

Fabrication, erection and dismantling of damaged structurals in hardwood and chipper house in pulp mill mechanical at tnpl unit-1

Read more
Extending and lowering of ms pipe 80mm and 100mm and submersible cable at twell no. s 15 t 1 t 2 t 3 t 4 in sector 3 panchkula

Extending and lowering of ms pipe 80mm and 100mm and submersible cable at twell&amp#x0d no. s 15 t 1 t 2 t 3 t 4 in sector 3 panchkula

Read more
Erection of 4th 160mva ptr and bay at 220/132kv ss shapurnagar

Erection of 4th 160mva ptr and bay at 220/132kv ss shapurnagar

Read more
Design, supply, erection and commissioning of spray pond ss common header, clusters with nozzles

Design, supply, erection and commissioning of spray pond ss common header, clusters with nozzles

Read more
Installation erection and commissioning of 01 no 400 220 kv 500mva transformer along with all associated works dismantling of 400 220 kv 240mva transformer with all accessories dismantling and erection of cts cvt isolators cb control and relay

Installation erection and commissioning of 01 no 400 220 kv 500mva transformer along with all associated works and dismantling of 400 220 kv 240mva transformer with all accessories dismantling and erection of cts cvt isolators cb control and relay

Read more
Laying and construction of steel pipeline along with associated facilities for malkapur hyderabad airport atf pipeline project

Laying and construction of steel pipeline along with associated facilities for malkapur hyderabad airport atf pipeline project

Read more
Supply and erection, testing and commissioning of 384v/900ah, 48v/155ah and 220v/600ah battery banks along with dismantling and buyback of existing battery banks at ctpp, chhabra

Supply and erection, testing and commissioning of 384v/900ah, 48v/155ah and 220v/600ah battery banks along with dismantling and buyback of existing battery banks at ctpp, chhabra

Read more
Laying of tower foundations erection of towers and stringing and sagging of conductor with earthwire for undergrounding of 66 kv oh line from 220 kv ss lalton kalan to 66 kv gill road ss at railway crossing on request of railway department

Laying of tower foundations erection of towers and stringing and sagging of conductor with earthwire for undergrounding of 66 kv oh line from 220 kv ss lalton kalan to 66 kv gill road ss at railway crossing on request of railway department

Read more
Providing and laying 900mm (36 inch ), 600mm (24 inch) and 450mm (18 inch) i/d rcc np 2 pipeline from h. no. 3001 to tail end at patiala ki rao for smooth disposal of storm water during heavy rainfall in maloya colony, chandigarh.

Providing and laying 900mm (36 inch ), 600mm (24 inch) and 450mm (18 inch) i/d rcc np 2 pipeline from h. no. 3001 to tail end at patiala ki rao for smooth disposal of storm water during heavy rainfall in maloya colony, chandigarh.

Read more
Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project

Dismantling/ dis-assembling, re-erection, re-installation, setting and alignment of assemblies / sub-assemblies after repairing on as and when required basis within 730 days in chp, nigahi project

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise