Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Electrical Hot Work Of 3800 Dwt General Cargo Vessel Uy166
|
| Description |
Electrical Hot Work Of 3800 Dwt General Cargo Vessel Uy166
|
| Organisation | Cochin Shipyard Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_CSL_760644_1 |
|
Reference Number |
UCSL/CC/T/W/026 Dt. 18th JUNE 2024 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Udupi Cochin Shipyard Limited, Malpe, Karnataka |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1064180 |
| Start Date | June 18, 2024 21:10 |
| End Date |
Expired
24/06/2024
Expired 841 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Contract for fitness for service assessment of vhv38 vessel at bpcl kochi refinery
Contract for fitness for service assessment of vhv38 vessel at bpcl kochi refinery
Read moreSupply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreProcurement and supply of ot lights high end and surgical diathermy with vessel sealing to vascular access centres in telangana state under rate contract for a period of 2 years
Procurement and supply of ot lights high end and surgical diathermy with vessel sealing to vascular access centres in telangana state under rate contract for a period of 2 years
Read moreProcurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Read moreConstruction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreLiquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Liquid chlorine cylinders delivery, fixing and arresting of emergency chlorine gas leakages duly engaging 3 nos of 11 ton gvw cargo vehicles equipped with hydraulic crane to load, unload and transport the chlorine tonners along with skilled and semi skilled labour at various reservoirs chlroination destinations approx 300 nos under the distribution system of hmwssb for a period of two years under central chlorination cell qat wing.
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreElectrical hot work of 3800 dwt general cargo vessel
Electrical hot work of 3800 dwt general cargo vessel
Read moreof your Industry type