Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 11 Nos. Isolation Stoppings For Resealing Of Old Depillared Panel 34 L East And 11 West Panel Through 84 L West Panel And 05 Nos. For Sealing Of 84 L West Panel Of East Block Of Churcha Mine (Ro).
|
Description |
Construction Of 11 Nos. Isolation Stoppings For Resealing Of Old Depillared Panel 34 L East And 11 West Panel Through 84 L West Panel And 05 Nos. For Sealing Of 84 L West Panel Of East Block Of Churcha Mine (Ro).
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 64600 |
Tender Value | |
Place | East Block of Churcha Mine (RO) |
Link |
AAAAAAAAAA Login to view |
Start Date | May 04, 2025 16:30 |
End Date |
19/05/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of exhaust fan house with evasee and boundary wall for east and west ventilation fans at ukwa mine.
Construction of exhaust fan house with evasee and boundary wall for east and west ventilation fans at ukwa mine.
Read moreConstruction of 11 nos. isolation stoppings for resealing of old depillared panel 34l east and 11 west panel through 84 l west panel and 05 nos. for sealing of 84l west panel of east block of churcha mine (ro).
Construction of 11 nos. isolation stoppings for resealing of old depillared panel 34l east and 11 west panel through 84 l west panel and 05 nos. for sealing of 84l west panel of east block of churcha mine (ro).
Read moreConstruction of total 09 nos. of full sectionalization/isolation stoppings and 05 nos. of peparatory isolation stopping
Construction of total 09 nos. of full sectionalization/isolation stoppings and 05 nos. of peparatory isolation stopping
Read moreReconstruction of 6 nos. isolation stoppings by rcc and replaster of 50 no. old isolation stoppings in depillared panels of seam ii and cleaning of fallen coal in old galleries at naheriya underground mine of pench area
Reconstruction of 6 nos. isolation stoppings by rcc and replaster of 50 no. old isolation stoppings in depillared panels of seam ii and cleaning of fallen coal in old galleries at naheriya underground mine of pench area
Read morePainting of all electrical equipments like transformer, ct, circuit breaker, nflp vcb, mocb and starter panel of main substation, churcha west substation and katghori substation of churcha mine (ro).
Painting of all electrical equipments like transformer, ct, circuit breaker, nflp vcb, mocb and starter panel of main substation, churcha west substation and katghori substation of churcha mine (ro).
Read moreWork for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine
Work for construction of 23 nos ventilation stopping between 45n and 46n from 12e to 19e and between 40n and 41n from 12e to 26e for proposed panel no cm2 and cm3 in no v seam of ncph colliery r-6 mine
Read moreRenovation of electrical installations andfans including replacement of old existing lt meter panel and service connection cable and allied electrical works for 9 nos type ii staff quarters in c block at katol road p and t colony nagpur nagpur region
Renovation of electrical installations andfans including replacement of old existing lt meter panel and service connection cable and allied electrical works for 9 nos type ii staff quarters in c block at katol road p and t colony nagpur nagpur region
Read moreConstruction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.
Construction of 30 nos rcc isolation stoppings and 4 nos brick made isolation stopping at 11dip proposed depillaring panel in massan combined seam of shiwani ug mine.
Read moreWork for sealing of the entries by constructing 03 nos explosion proof stopping of rcc wall for 03 nos of adits and 01nos isolation stopping of r.c.c. wall for the airshaft of no 3 seam of ncph colliery r6 mine.
Work for sealing of the entries by constructing 03 nos explosion proof stopping of rcc wall for 03 nos of adits and 01nos isolation stopping of r.c.c. wall for the airshaft of no 3 seam of ncph colliery r6 mine.
Read morePreparation of land use map through drone survey and dgps total station for tara (east ) and tara(west) coal mine of wbpdcl
Preparation of land use map through drone survey and dgps total station along with detailed topographical, surface feature and plot information linked with the plot map in gis platform for operationalization of tara (east ) and tara(west) coal mine
Read moreof your Industry type