Tender Details

Particulars Details
Title
Redevelopment And Stabilization Of Tube Well Pindi Charkan.
Description
Redevelopment And Stabilization Of Tube Well Pindi Charkan.
Organisation I and FC | State Govt. and UT
Tender Id 2024_IFC_254267_1
Reference
Number
87/EE/CD-III/IFC/2023-24/
Tender Fee 500
EMD 9000
Tender Value -
Place Bishnah
Link
View Original Tender Notice

https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=739381

Start Date July 26, 2024 15:30
End Date
Expired 05/08/2024

Expired 762 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of slope stabilization works by way of drsm at 38 mankal, mawer range

Construction of slope stabilization works by way of drsm at 38 mankal, mawer range

Read more
Supply of water materials non return valve and sluice valve wtp hammagi jack well pump house dambal at gbcmc limits.

Supply of water materials non return valve and sluice valve wtp hammagi jack well pump house dambal at gbcmc limits.

Read more
Renovation to e/w & e/i of conference hall, campus lighting as well as provision of sitc of split type ac at subdivisional office, teghra, distt.-begusarai.

Renovation to e/w & e/i of conference hall, campus lighting as well as provision of sitc of split type ac at subdivisional office, teghra, distt.-begusarai.

Read more
Selection of a supplier for supply of energy efficient appliances i.e. led bulb, led tube light and bldc ceiling fan to the selected govt. schools across bihar state.

Selection of a supplier for supply of energy efficient appliances i.e. led bulb, led tube light and bldc ceiling fan to the selected govt. schools across bihar state.

Read more
Repair work of 800mm dia bws pipe line in gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe , korlahalli 2nd bridge and dhoni cross ,hammagi jack well pump house ,adavisambapur bharath petrol bunk , lic office near ring road papanasi kalmeshwar temple cross at gbcmc limits.

Repair work of 800mm dia bws pipe line in 1) gaddi halla 150mm near air wall , 2) koralhalli infront of toll gate bridge ms pipe 3) near bannikatti indian petrol bunk 4) infront of nayara pentro bunk 100mm air vall 5) hammagi jack well pump no 1 and 2, 6) dambal hunasi thota expention joint 7) gaddi halla 90mm ms pipe 8) korlahalli 2nd bridge and dhoni cross 9) hammagi jack well pump house 10) adavisambapur bharath petrol bunk , lic office near ring road 11) papanasi kalmeshwar temple cross at gbcmc limits.

Read more
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.

Read more
Making rcc reinforced cement concrete retaining wall in the basement of student hostel at lacones

Making rcc reinforced cement concrete retaining wall in the basement of student hostel at lacones

Read more
Investigation on thermal-hydraulic behavior of inclined natural circulation loop to sdm college of engineering and technology, dharwad

Investigation on thermal-hydraulic behavior of inclined natural circulation loop to sdm college of engineering and technology, dharwad

Read more
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode

Read more
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh

Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise