Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Infrastructure Facilities For Establishment Of Rainbow Trout Brood Bank At Trout Fish Farm Patlikuhal Distt. Kullu H.P. (Sh Construction Of 2 Nos Quarantine Tank Size 17mx2mx1.5m )
|
Description |
Infrastructure Facilities For Establishment Of Rainbow Trout Brood Bank At Trout Fish Farm Patlikuhal Distt. Kullu H.P. (Sh Construction Of 2 Nos Quarantine Tank Size 17mx2mx1.5m )
|
Organisation | HP Aquaculture Fisheries and Marketing Society | State Govt. and UT |
Tender Id | 2025_HAFMS_103246_1 |
Reference Number |
2025_HPAFMS_1915_1 |
Tender Fee | 500 |
EMD | 25150 |
Tender Value | |
Place | Patlikuhal Distt Kullu HP |
Link | https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=151567 |
Start Date | April 02, 2025 00:00 |
End Date |
09/04/2025 ( Expired 73 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreEstablishment of centre of excellence for flower at lembucherra sh construction of drain and walking road
Establishment of centre of excellence for flower at lembucherra sh construction of drain and walking road
Read moreDesign, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Design, engineering, construction, supply, erection, commissioning and testing of four number of natural draught cooling towers, cooling water pump house and associated works for ghavp unit 1 and 2 at vill gorakhpur, distt fatehabad, haryana.
Read moreConstruction of 04 nos of rcc wall for underground water tank incl. laying and fitting of pipeline in development /widening and depillaring panel(cm panel-c1 and c2)in vi top seam at bangwar ug mine(for the year 2024-25 and 2025-26)
Construction of 04 nos of rcc wall for underground water tank incl. laying and fitting of pipeline in development /widening and depillaring panel(cm panel-c1 and c2)in vi top seam at bangwar ug mine(for the year 2024-25 and 2025-26)
Read moreConstruction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Construction of new buildings for 1) sw post matric girls hostel at palamaner, 2) sw post matric boys hostel at gudiyatham road, palamamer in chittoor district, 3) sw pre matric girl hostel at proddatur, 4) sw pre matric boys hostel at kalasapadu in ysr kadapa district, 5) sw pre matric girls hostel at manubolu in spsr nellore district and 6) sw pre matric boys hostel at tirupati as package -v (6 nos) under pm ajay - esti.rs.1800.00 lakhs
Read moreAAAAAAAAAA
Login to viewConstruction of steel motorable bridge over river indus at dungti to khoryul farm tsaga in district leh ut of ladakh sh providing 01 nos inspection vehicle for the office of architect jammu
Read moreSopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Sopd_g_24_25_40 construction of road cum embankment on left bank of dikrong river (nh 15 at bahanibari to sissapathar bridge approach)( part 2 from ch. 11880.00m to 15140.00m) including approach roads under sopd g for the year 2024-25
Read moreConstruction of 17 nos vertical filter chamber with silt chamber after vfc for institutional / community house hold grey water management project at atharobanki sansad 2 under atharobanki gram panchayat, canning ii block
Construction of 17 nos vertical filter chamber with silt chamber after vfc for institutional / community house hold grey water management project at atharobanki sansad 2 under atharobanki gram panchayat, canning ii block
Read moreConstruction of gram panchayat community centre panchayat ghar at pekhdi development block banjar distt. kullu himachal pradesh sub head site development civil work in ground floor and first floor septic tank and water supply sanitary installations
Construction of gram panchayat community centre panchayat ghar at pekhdi development block banjar distt. kullu himachal pradesh sub head site development civil work in ground floor and first floor septic tank and water supply sanitary installations
Read moreExtensive repair and renovation of 3 nos aluminum boats and trolley 2 nos and boat of size 12 20long and 25 long lying at karkari store of iandfc department for the year 2025.
Extensive repair and renovation of 3 nos aluminum boats and trolley 2 nos and boat of size 12 20long and 25 long lying at karkari store of iandfc department for the year 2025. &#x0d &#x0d
Read moreof your Industry type